My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 TJC and Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 TJC and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2013 4:26:09 PM
Creation date
5/2/2012 3:21:54 PM
Metadata
Fields
Template:
Agreement
Contractor Name
TJC and Associates, Inc.
PROJECT NAME
Sanitary Sewer Pump Statio Number 10 upgrade eletric
RMP File Number
604
Date
5/1/2012
MO Ref
12-076, 13-128
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10. Remote data acquisition will match existing except for incorporation of dual VFDs; no <br /> programming of SCADA Central HMI is necessary except for new address of RTU and dual VFD <br /> graphic <br /> 11. Provide interim and final controls as required to maintain remote status monitoring and control <br /> during construction <br /> 12. RTU programming included as an allowance pending final control approach developed with City <br /> staff during preliminary and final design; control requirements that exceed the allowance may be <br /> incorporated as Additional Services as noted below <br /> 13. Record drawings shall incorporate information from Contractor red-lined markups developed <br /> during construction <br /> Deliverables: <br /> 1. Minutes, questions, and responses from pre-bid meeting <br /> 2. Text for Addendum if required <br /> 3. Review comments to Contractor submittals <br /> 4. Responses to Contractor RFI <br /> 5. Review of change order documents <br /> 6. Record Drawings <br /> 7. Control system programming for renovated pump station configuration <br /> 8. Site training of City operators on RTU related control features <br /> 9. O&M documentation for new RTU programming <br /> TIME SCHEDULE <br /> Final schedule to be coordinated with approved project by City. <br /> . . . . <br /> CONSULTANT Notice to Proceed (Assumed) To be determined <br /> Preliminary Design (60% Complete) Submittal Six weeks after Notice to Proceed <br /> Preliminary Design (60% Complete) Workshop One week after 60% Submittal <br /> Preliminary Design (100% Complete) Submittal Two weeks after receipt of final City 60% review <br /> comments <br /> Final Design (100% Complete) Workshop One week after 100% Submittal <br /> Stamped and Signed Documents Delivered to Two weeks after receipt of final City 100% and <br /> City permit review comments <br /> Start of Bid Period To be determined <br /> Contractor's Bid Opening To be determined <br /> Award of Construction Contract To be determined <br /> Construction Completed To be determined <br /> ATTY/AGR/2012.032/TJCAA <br /> REV:03-22-12 VR <br /> Page 13 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.