My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Advanced Sewer Technologies
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Advanced Sewer Technologies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2012 5:55:01 PM
Creation date
5/10/2012 5:55:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Advanced Sewer Technologies
PROJECT NAME
CCTV Inspection and cleaning for that purpose, of slected pipelines in sanitary sewer basins 4,5C,and 9.
RMP File Number
304
Date
5/12/2012
MO Ref
12-075
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Night Work <br /> If flow and/or traffic are an issue for CONTRACTOR to complete a segment, arrangements will be made <br /> with City to work at night. CONTRACTOR shall provide businesses/residences 48 hours prior notice of <br /> any potentially disruptive activity. <br /> Submittals <br /> After the project is complete, CONTRACTOR shall provide the City with an external hard drive containing <br /> the videos, jpegs, and inspection reports. This hard drive shall become property of the City of Redwood <br /> City. <br /> DEADLINE: <br /> CONTRACTOR shall complete all work within 60 (sixty) Calendar days of the City's notice to proceed. <br /> CONTRACTOR shall put a third crew on this project if needed. CONTRACTOR shall average about <br /> 3,000 linear feet per day, per crew, which shall allow CONTRACTOR to finish within the City's timeframe. <br /> CONTRACTOR shall provide the City with a detailed work schedule, to include streets and dates, at <br /> City's request. <br /> PAYMENT TERMS: <br /> Fee shall include all labor, materials, and equipment necessary to clean and inspect manholes, clean and <br /> inspect sewer lines, implementing traffic control, procuring water, disposing of debris, and delivering hard <br /> drive as noted. <br /> Sanitary Sewer Sanitary Sewer Sanitary Sewer Linear <br /> Basin No 4 Basin No 5C Basin No 9 Foot <br /> Diameter Linear Feet Linear Feet Linear Feet Price <br /> 4 " -- -- -- <br /> 6" 23,709 3,579 5,929 $1.24 per If <br /> 8" 3,706 12,518 7,996 $1.24 per If <br /> 10" 320 1,516 589 $1.24 per If <br /> 12" 702 -- -- $1.24 per If <br /> 15" 2,536 -- -- $1.24 per If <br /> 16" 29 -- -- $1.24 per If <br /> 24" -- -- 2,177 $1.24 per If <br /> Man-hours Breakdown <br /> Basin No 4— 31,002.00 Linear feet <br /> Cleaning Truck —1 Man — Approximately 83.5 Hours to Complete* <br /> CCN Truck —1 Man — Approximately 83.5 Hours to Complete* <br /> Basin No 5C —17,643.00 Linear feet <br /> Cleaning Truck — 1 Man — Approximately 48 Hours to Complete" <br /> CCTV Truck —1 Man — Approximately 48 Hours to Complete* <br /> Basin No 9-16,691.00 Linear feet <br /> Cleaning Truck —1 Man — Approximately 45 Hours to Complete* <br /> CCTV Truck —1 Man — Approximately 45 Hours to Complete* <br /> *Includes 8 hours on job with traffic control setup, getting water for cleaning truck, disposal of <br /> debris, as well as clean and CCTV of sewer lines. <br /> Total Cost of Services: $81,016.64 <br /> ATTYIAGR/2012. 0401ADVANCED SEWER TECHNOLOGIES EXHIBIT A <br /> REV:04-03-12 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.