Laserfiche WebLink
7.A. - Page 5 <br /> breaks, happy hour, and miscellaneous shopping. However, it is not clear from the <br /> proposal to what degree this activity would materialize. If the office tenants equip their <br /> spaces with significant cafeterias, lounges, and recreational facilities, then the presence <br /> of the workers outside of the building could be minimal. The analysis by Sedway <br /> Consulting cites a study by the International Council of Shopping Centers which asserts <br /> that office workers outside of the regional core spend about $7,620 per year on dining <br /> and shopping near their workplace. <br /> For the hotel, the Sedway analysis provided by Lowe estimates an average of 1.5 <br /> people per guest room and an average occupancy of 65%, resulting in as many as 136 <br /> guests per day. Sedway does not estimate the retail spending per guest, but staff <br /> anticipates that these visitors are likely to frequent Downtown establishments because <br /> of the nature of hotel use, the easy access to restaurants and entertainment, and the <br /> constrained hotel site. Sedway's analysis also estimates about 112 employees for the <br /> hotel, with about $1,900 per year in Downtown retail spending per worker. <br /> The development proposes large floor-plate Class A office space, which is not widely <br /> available in the Downtown. Consequently, it should be attractive to new types of <br /> tenants for the area. The hotel is a new type of use for powntown and would add a <br /> service that is currently lacking. Although there are new residential projects in the <br /> planning and building queue, the Downtown residential market is still in its infancy. An <br /> additional large apartment building would contribute to the emergence of a strong <br /> housing market Downtown. <br /> Office tenants have not been identified by Lowe for the project. Although the Downtown <br /> Redwood City office market is presently strong, and the developer has expressed <br /> confidence that the buildings would be occupied quickly, it is impossible to ensure that <br /> the building will be occupied within a defined period of time after the completion of <br /> construction, especially without commitments from tenants. <br /> Market trends are also strong for for-rent housing in San Mateo County and Lowe <br /> asserts that the residential building would be fully leased in short order. <br /> Desiqn <br /> The design appears to conform to the Downtown Precise Plan. It is important to make <br /> this distinction at this time, as there are no architectural plans for the project, only <br /> renderings of concepts. The details of design will be resolved during the negotiation <br /> process and presented to the Council as a part of a Development Agreement. <br /> The architecture of the office building is streamlined Neoclassical, which does not <br /> conflict aesthetically with the surrounding building stock. The residential building is also <br /> Neoclassical as defined by the Plan, but includes a strong French influence associated <br /> with its mansard roof. The buildings are all visually divided into a base, middle, and <br /> cap, which contribute a sense of pedestrian scale in large structures. The facades <br /> follow the shape of the streets, creating a strong urban presence, and the height limit <br /> appears to be met. <br />