My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 David J. Powers and Associated, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 David J. Powers and Associated, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2012 3:31:03 PM
Creation date
5/24/2012 3:31:01 PM
Metadata
Fields
Template:
Agreement
Contractor Name
David J. Powers and Associated,Inc.
PROJECT NAME
Professional Services- IS- for Kensington Assisted Lving Facility
RMP File Number
304.5
Date
5/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� Site plan which includes building footprints, parking spaces, and vehicle <br /> circulation. <br /> • Conceptual elevations that show building height and appearance <br /> • Square footage of previous and impervious surfaces pre- and post-construction. <br /> � Existing and projected annual water use <br /> • Stormwater Quality Control Plan (construction and post-construction) <br /> • Green building measures (if proposed) <br /> � Geotechnical Report (if available) <br /> COST <br /> Consultant will complete the environmental review for the not-to-exceed total cost in <br /> Section 6 of the Agreement. Within this not-to-exceed total, actual amounts spent on <br /> individual tasks may be more or less than the estimates. <br /> Consultant's work will be billed on a time and materials basis, in accordance with the <br /> attached fee schedule. Consultant will only bill you for the time that Consultant has <br /> actually spent completing the work. The following is a breakdown of the cost estimate: <br /> David J. Powers & Associates <br /> In-house Staff Time (including meetings and hearings) $20,280 <br /> Expenses/Reproduction $ 2,700 <br /> Subconsultants <br /> Illingworth & Rodkin (Air Quality) $ 6,900 <br /> Total $29,880 <br /> ENVIRONMENTAL REVIEW SCHEDULE <br /> Consultant proposes the following optimum schedule for preparation of the IS. <br /> Consultant can commit to maintaining the schedule in the areas that are within our <br /> control. Delays in receiving requested information or responses by others will result in <br /> at least day-for-day delays in the overall schedule. This schedule assumes only one <br /> Administrative Draft IS and one Screencheck IS. <br /> Kensington Assisted Living Facility <br /> O timum IS Schedule <br /> Task Week Complete <br /> Receipt of Authorization to Proceed and Project Details ___ <br /> Receipt of Technical Reports from Subconsultants 4 <br /> Preparation and Submittal of the Administrative Draft IS to City g <br /> Review of Administrative Draft IS by City Staff 9 <br /> ATTY/AGR/2012.054/DAVID J POWERS AND ASSOCIATES KENSINGTON ASSISTED LIVING FACILITY <br /> REV:05-08-12 VR <br /> Page 13 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.