My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-06-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 9:41:29 AM
Creation date
6/25/2012 8:57:57 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/25/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.1. - Page 7 <br /> (e} water system,complete <br /> (t} storm drainage system, complete <br /> (g) si�e lighting system,com.plete <br /> (h) street t�ess <br /> (i) landsoaping and irriga�ion system complete <br /> (j) utility joint trenching <br /> {k} and all other work, improvements, or construction required by or mentioned in the <br /> abovementio�ed plans and specifications, co�di�ions af permits and all construction, <br /> appurtenances and improveanents necessary as raasonable determined by the City ( <br /> Engineer to complete the aforemer�tioned impravements, both within and outside of <br /> the abovementioned subdivision. � <br /> The construction, installation and complation of the Irnprovements and all labor and mate:rials fi►r�nished <br /> in connection therewith are hereinafter raferred to collectively as the "Work," Tha Work and <br /> Impravements shall be in strict cornpliance with the provisians of the Downtowr► Precise Plan. In the <br /> event a conflict exists between the Plar�s and the requirernents of the Downtown�recise Plan,the shicter <br /> requiretnant or standard shalt gover�,as c�eter�nined by t1�e City Engineer. <br /> 3. Completion Date. Developer will complete the Work wit�in twenty (20} months <br /> following the Effective Date. All Wark will be completed in a goad and warkrnanlike �nanner in <br /> accordance with the T�nprovernent 1'lar�s. This cornpletio� date may be extended by City in its sole and <br /> absolute discretion at tha request of Developer, which request shall be accompanied by a written <br /> ass�rance aeceptable to the City Engineer that the securities required by Sectio� 13 shall rernain <br /> enforceable throughout the term of the extensio�. <br /> 4, Estimated Cost af Work. The engineer's estimated cost of the Work is Three Hundred <br /> Sixty S�Thousand Six Hundred Fifty and No/100 Dollars($366,650A0}("Estimated Cost of Work"}. <br /> 5. Modifications to the Plans. Approval of this Agreez�ent by City does not release <br /> Developar of its respansibi�ity to correct mistakes, errors or omissions in the Improvement Plans. If, at <br /> any time, in the opinion of the City Engineer, in his reasonable discr�tion, the Imp:rovement Plans are <br /> deemed inadequatie in any respect, Develope��ag�•ees to mat�e such modifications, changes or revisions as <br /> reasonably necessary in order to complete the Work in a good and workmanlike manner in accordance <br /> with accepted design and consh-uction standards and consistent with the Downtawn Precise Plar� and <br /> Improvement Plans. <br /> 6. Ret�airs. Developer agrees to repair ar have repaired in a ti�nely manner at its sole cost <br /> and expanse a11 public �•oads, streets, or other public or private property damaged as a result of or <br /> incidental to the Work or in connection with the developtnant of the Property. City shall be under no <br /> obligation whatsoever to accept the Work connpleted under this Agreement until such time as all repairs <br /> have been co�npleted or have been paid for. <br /> 7. Foretxxan or Superintendent, A competent foreman or superintendent, satisfactory to the <br /> City Engineer in his reasonable discretion with authority to act for and on behalf of Developer, shall be <br /> nanaed in writing by Develope�• prior to commencement of the Work, shall be present on the Property <br /> ATTYIAGRi2012.055iS11B�IViSION IIV�['FtOVEMENTAGFtEEMENT201 MIARSHAI.L <br /> REV:06-05-12 VR <br /> Page 2 oE�6 <br /> �i <br />
The URL can be used to link to this page
Your browser does not support the video tag.