My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-06-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 9:41:29 AM
Creation date
6/25/2012 8:57:57 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/25/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.1. - Page 45 <br /> � � �� � � � ��' �� <br /> FloGard Perk Fi[ter <br /> Maintenance Plan for 201 Marshall Street <br /> Project Address & Cross Streets: 201 Marshal6 St <br /> Bound by Bradford,Arguello and Marshall Streets <br /> Assessor's Parcel I�o.: 052-326-100 <br /> f'roper�y Owner: Raintree Partners <br /> Phone No.: {949)365-5650 .--- <br /> �esignated Cantact: Jason Check <br /> Mailing Address: 28202 Cabot Road, Suite 300 <br /> Laauna Niauel. CaGfornia 92677 <br /> The property contains three (3)flow-through planter{s}, located as d�scrib�d below and as shown in <br /> the attached site plan: <br /> ■ Fto-Gard Perk Filter #1 is located in the sidewalk or� Bradford Street at the intersec#ion <br /> with Argu�llo Street. <br /> ■ Flo-Gard Perk Filter #2 is located in the sidewalk on Marshall Street near the <br /> intersection with Arguello Street. <br /> � Flo-Gard Perk Fil#er #3 is located in the sidewalk or� Marshall Street at approxirna#ely <br /> mid-block b�#ween Arguelio Street and Warren 5treet. <br /> l. Routine Maintenance Activi�ies <br /> �he principai maintenar�ce abjecti�es are to ensure tha#water fiows unimpeded into the flow-#hrough <br /> planter and landscaping remains attractive ir� appearance. Table 1 shows tYte routir�e maintenance <br /> activities, and the frequency at which they will be conducted. <br /> Table'! <br /> Routine Maintena�ce Activities for FloGard PerEc Fiiter <br /> No. Maintenance Task Frequency of Task <br /> 1 Remove aceumulated sediment,litter ar�d debris from FloGard Perk�iiter Before wet season artci as <br /> and dis�ose of properly. Confirm that no clogging will occur and tha#the necessary <br /> structure wi[I drain per des€gn standards. <br /> 2 Irsspect FfoGard Perk Filter to ensure that tf�ere are no clogs. Test with Monthly during the wet season, <br /> garden hose to confirrn that the filter will drain per desig�standards. and as needed after stor€r3 <br /> events <br /> 3 Er�spect downspouts from rooftops and sheet flow from paved areas to Monthly during the wet season, <br /> e�€sure flowto fro�FloGard Perk Filter[s[�nirrEpeded. Remoue debris and and as needed after storm <br /> repai�damaged pipes. Check splash blocks or rocks a�d r�;pair, replace and events <br /> replenish as necessary. <br /> 4 Inspect overflow pipe to ens�are that iE will safely convey excess#iows to Before the vvet season,and as <br /> storrn drain. Repair or replaee any damaged or disconnected piping. r�ecessary <br /> 5 Inspect�IoGard Perk Fi[ter to ens�re tf�at box is structurally sound(no Annually <br /> cracks or Ieaks). Repair as n�cessary. <br /> 6 Inspect FloGard Perk Fi[ter using the attached inspection checklist for Level Per mar�ufacturer's <br /> 'f, Level 2 and Level 3 inspect'sons(see attached�[oGard Perk Filter recomrnendations(attached) <br /> Systems Operatior�s and Ma€ntenance Manual) <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.