Laserfiche WebLink
CONSULTANT RESUMES <br /> Proposed work shall be performed by the Consultant's key staff member - Ms. <br /> Barbara Beard and Ms. Christina Lau. <br /> BARBARA BEARD, Director of Environmental Analysis/Senior Project Manager II <br /> Ms. Beard is a CONSULTANT Senior Project Manager and Senior Analyst with over 20 <br /> years of experience in preparing documentation pursuant to NEPA and CEQA. As a <br /> Senior Project Manager she has directed the preparation of CEQA documents on a <br /> wide variety of projects including those for landfills and waste processing facilities, <br /> pipelines, linear recreational trails, concrete and asphalt recycling facilities, schools, a <br /> new county jail and other municipal infrastructure projects in San Mateo and Santa <br /> Clara Counties. She is skilled in working with clients and lead agencies to determine the <br /> scope and content of environmental analysis documents and guiding complex and <br /> controversial projects through the CEQA process. She provides technical expertise on a <br /> variety of work products, including constraints analyses, Initial Studies, EAs, EIRs/EISs. <br /> In her capacity as the Director of Environmental Analysis at CONSULTANT, Ms. Beard <br /> directs staff in the technical analysis and preparation of environmental documents, <br /> provides quality control over environmental impact analysis work products, assigns staff <br /> to projects based on the required expertise needed for the project, and maintains <br /> contact with the client, project engineers, and the lead agency. <br /> Selected Projects <br /> • Senior Project Manager for the California Water Tank and Pump Station project <br /> IS/MND in Redwood City. Project involves the construction of a 0.75 million gallon <br /> water tank, a new pump station and over 2,000 feet of new water line. Project issues <br /> included aesthetic impacts to surrounding residences, construction in hillside setting, <br /> grading in asbestos containing soils and loss of oak trees. <br /> • Senior Project Manager for the Edgewood Canyon Subdivision Supplemental EIR <br /> for San Mateo County (2010 — 2011). Project involves 18,800 cubic yards of cut and <br /> importation of 50,885 cubic yards of fill creating geotechnical and visual impact <br /> concerns and inconsistency with San Mateo County Design Review Guidelines. <br /> • Senior Project Manager for the 3240 Scott Boulevard Restaurant Conditional Use <br /> Permit IS/ND in the City of Santa Clara 2011-2012. <br /> • Senior Project Manager for the ACE Charter School IS/MND (2011). Project <br /> consisted of the construction of a new 473-student charter school serving middle <br /> school aged children in San Jose, Califomia. Issues associated with this project <br /> ATTY/AGR/2014/AMENDMENTS/AMEND NO.1 TRA ENVIRONTENTAL SCIENCES INC.—CALIFORNIA TANK <br /> REV:06-05-14 VR <br /> Page 13 of 17 <br />