Laserfiche WebLink
included neighborhood traffic impacts and air quality impacts to the students from <br /> nearby highway traffic. <br /> • Senior Project Manager for the Maple Street Replacement Facility IS/MND for the <br /> San Mateo County Sheriff's Office (2010). Project involves relocating the existing <br /> correctional housing from several existing locations to a new 768-bed facility located <br /> in an industrial area of Redwood City. Environmental issues related to this project <br /> included constructing and operating a jail on a site with soil and groundwater <br /> contamination, inmate exposure to toxic air contaminants for a nearby highway, <br /> construction air emissions, inundation from sea level rise, and interior noise levels. <br /> • Senior Project Manager for the North Coast County Water District Water <br /> transmission Pipeline IS/MND (2008 to present). Project assessed impacts of <br /> constructing a water pipeline to serve the Devil's Slide Tunnels constructed by <br /> Caltrans on the San Mateo County coast. CONSULTANT also prepared a Biological <br /> Assessment in support of the Biological Opinion amendment through the U.S. Fish <br /> and Wildlife Service and provided permitting assistance to obtain permits from the <br /> California Department of Fish and Game and Regional Water Quality Control Board. <br /> Potential environmental impacts associated with this project included potential take <br /> of the California red-legged frog and avoidance of impacts to wetlands and riparian <br /> habitats. <br /> • Project Manager for the Concrete and Asphalt Recycling Facility Project IS/MND in the City <br /> of Half Moon Bay (2007). Environmental impacts associated with this project included air <br /> and noise impacts to an adjacent mobile home park, land use conflicts between proposed <br /> operation and adjacent land uses, and overall design and operation of the facility to ensure <br /> conformance with waste handling regulations and to prevent operational impacts. <br /> • Project Manager for the Guadalupe Landfill Materials Recovery Facility IS/MND. <br /> • Project Manager for the constraints analysis and detailed Initial Study for the City of San <br /> Jose portion of the San Francisco Bay trail. Directed the preparation of a constraint analysis <br /> designed to highlight potential environmental impacts so that the public and local, regional <br /> and federal agencies whose lands the trail would cross would be able to understand the <br /> details of the project and identify environmental conflicts. Directed the preparation of a <br /> comprehensive Initial Study on the project, once the trail route was developed. Contributing <br /> author on other trail projects including several reaches of the Stevens Creek trail in the City <br /> of Cupertino, the reach of the Stevens Creek trail in the City of Santa Clara, and a Class II <br /> bike lane project along San Juan Highway in San Benito County. <br /> Educational Background <br /> University of Michigan, Ann Arbor, MI <br /> Bachelor of Science, Natural Resource Policy & Management <br /> ATTY/AGR/2014/AMENDMENTS/AMEND NO.1 TRA ENVIRONTENTAL SCIENCES INC.—CALIFORNIA TANK <br /> REV:06-05-14 VR <br /> Page 14 of 17 <br />