My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 TRA Environmental Sciences, Inc. MIG/TRA Environmental Services Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 TRA Environmental Sciences, Inc. MIG/TRA Environmental Services Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 3:44:49 PM
Creation date
7/5/2012 9:45:37 AM
Metadata
Fields
Template:
Agreement
Contractor Name
TRA Environmental Sciences, Inc. 6/2015 Now known as MIG/TRA Environental Services Inc.
PROJECT NAME
Initial Study and Mitigated Negative Declaration- water tank, pump station and pipelines proposed for the CA pressure zone in the Emerald Hills area.
RMP File Number
304
Date
6/28/2012
MO Ref
12-123, 14-104, 15-094,16-082
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> The_Citv of Redwood Citv (the Citv) is currentiv in the process of qreparinq an EIR for the <br /> California Water Tank and Pump Station Proiect. The Citv is studvina an alternative location <br /> within the qroposed site called the Hillside Alternative to build the water tank and pump station. <br /> This requires additional geotechnical exploration in the location of the Hillside Alternative and <br /> seismic modeling, the development of a conceptual site plan and engineering design <br /> information, the preparation of visual simulations, and additional tree survey work. This design <br /> information will then be incorporated into the Draft EIR. <br /> Environmental and Planninq Work—Task 1, 2 and 3 <br /> Consultant will coordinate team tasks needed to define the Hillside Alternative, record tree <br /> locations with a GPS unit, and add the new alternative to the EIR: <br /> Define Hillside Alternative: Consultant has participated in team conference calls, drafted <br /> a number of emails and participated in a site visit to support the definition of the Hillside <br /> Alternative. Additional team coordination will occur as the design team addresses <br /> geotechnical constraints and finalizes the proposed location of the water tank. This task <br /> also include three hours for Consultant field staff to GPS tree locations and pcovide data <br /> file to other consultant team member. <br /> Add Alternative to EIR: Consultant will incorporate the Hillside Alternative analysis <br /> throughout the EIR. It will be given the same level of analysis and graphic <br /> documentation as the other alternatives. The primary discussion will be presented in the <br /> Alternatives Chapter but all chapters will be revised as appropriate to reflect the new <br /> alternative. Landscapina and Visual Simulation Work is included and covered in this <br /> task- <br /> Consultant will provide an arborist report on the tree removal associated with the Hillside <br /> Alternative and prepare new visual simulations of this alternative. <br /> Visual Simulation: Consultant will develop a visual simulation of the Hillside Alternative <br /> comparable to the existing simulations. The photos used in the existing simulations will <br /> adequately show the Hillside Alternative; no new photos are needed for this new <br /> simulation. Consultant will submit a draft of the simulation for review and revise it per <br /> input received. <br /> The visual simulations are created using the locations and vegetation types proposed in <br /> the conceptual landscaping plan. Because the Hilliside Alternative is partially outside the <br /> area covered in the existing Conceptual Landscape Plan prepared for the proposed <br /> project, Consultant will need to prepare a conceptual landscape plan covering the <br /> additional area that will be impacted by the Hillside Alternative. The conceptual <br /> landscape plan for the Hillside Alternative will be based on the existing conceptual <br /> landscape plan. A draft of the plan will be circulated for review and revised per <br /> comments received. <br /> ATTY/AGR/2015/AMENDMENTS/AMEND NO.2/MIG TRA—CATANK ALTNERNATIVE SITE STUDY <br /> REV:05-28-15 VR <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.