Laserfiche WebLink
6.1.B. - Page 2 <br /> and responsible bidder. <br /> The low bid of $318,691.50 submitted by Aquatic Environments, Inc. is 59.3% higher <br /> than the engineer's estimate of $200,000. Staff based the engineer's estimate on the <br /> cost to dredge the lagoon last year. Staff attributes the variance to project uncertainties. <br /> Quantities were, and remain, uncertain, as to how much material is to be removed from <br /> inside the discharge pipes and the amount will not fully be known until work begins. <br /> Consequently, bids were higher than estimated to reflect this risk. Based upon a <br /> thorough review of the bids received, staff believes the low bid of $318,691.50 is <br /> reasonable and responsive, and recommends awarding the contract to Aquatic <br /> Environments, Inc. <br /> This project requires several environmental permits from the Army Corps of Engineer, <br /> the Regional Water Quality Control Board, the San Francisco Bay Conservation and <br /> Development Commission, US Fish and Wildlife Services and the State Marine <br /> Fisheries. The City's environmental consultant has been working on obtaining the <br /> permits and the issuance of these permits is imminent. The Contract Document for this <br /> project specifically requires the issuance of these permits as a condition of the award of <br /> this contract. Therefore, Council is asked to award this contract contingent on the City's <br /> receipt of the required environmental permits. <br /> Oracle Corporation operates a lagoon which also discharges to this slough proximate to <br /> the City's discharge structure. The City is working cooperatively with Oracle on this <br /> project since Oracle also desires to improve the discharge from their lagoon. Oracle <br /> has selected Aquatic Environment, Inc. as its contractor to dredge the portion of the <br /> lagoon for which it is responsible. <br /> The timing of the City's project is important since the City's and Oracle's portions of the <br /> work should be performed at the same time to save mobilization and impacts on <br /> permitting. This authorization is being pursued now to ensure that this project can <br /> proceed this summer as soon as the permits are issued. <br /> ALTERNATIVES <br /> Council may choose not to award the contract and direct staff to reject all bids, redesign <br /> and/or offer this project again for public bid, or delay award to this project until next <br /> fiscal year. <br /> FISCAL IMPACT <br /> Funds for this project were approved and appropriated in Fiscal Year 2010/11 budget, <br /> as GID 1-64 Maintenance and Operation Fund — Marine Parkway Pump Station which <br /> has an available balance of $593,768 as of May 31, 2012. <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency, City of Redwood City has determined that the Belmont Slough <br /> Maintenance Dredging Project meets the California Environmental Quality Act (CEQA) <br /> exemption criteria as set forth in Section 15304.G of the CEQA Regulations. <br /> Furthermore, this project has been designed compliant with the city's Engineering <br /> Standards and accepted practices. <br />