My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.C. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> July 9, 2012 <br /> SUBJECT <br /> Award of Contract — 2011-2012 Spot Repair and Overlay Project <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract <br /> 00520 for the 2011-2012 Spot Repair and Overlay Project to O'Grady Paving Inc. of <br /> Mountain View, for the responsive and responsible low bid of $867,564.00 and <br /> authorize City Manager to increase the contract amount, if necessary, up to 10% of the <br /> amount awarded. <br /> BACKGROUND <br /> Pavement requires repairs for a variety of reasons including general aging, the <br /> damaging effects of traffic loads, weather, intrusive tree roots and water. The 2011- <br /> 2012 Spot Repair and Overlay Project is part of the city's Roadway Management <br /> Program designed to address on-going pavement repair and replacement. The <br /> Roadway Management Program inventories, assesses, and tracks maintenance of the <br /> city's roadways. Roadways are selected for resurfacing based on staff's assessment of <br /> overall condition and projects are coordinated to make the most efficient use of <br /> resources. <br /> Typically, all spot repairs are performed and selected roadways overlaid with asphalt <br /> concrete as part of the work of the same contract. Roadway surfaces that do not <br /> receive an overlay, are later slurry sealed or cape sealed under a separate contract. <br /> The work is scheduled in this manner because the application of asphalt concrete, <br /> slurry seal, and cape seal are three separate trade specialties. Consequently the city <br /> contracts with separate contractors for asphalt concrete, slurry seal, and cape seal <br /> resurfacing to achieve economy of scale and reduce subcontractor markup. This <br /> results in more cost effective projects. <br /> ANALYSIS <br /> This specific project will repair failed asphalt sections on the streets noted below, <br /> overlay Main Street and Kentfield Avenue with asphalt concrete, and make the <br /> temporary speed table on Vera a permanent traffic calming feature. <br /> Repairs to streets are being made prior to resurfacing those streets as part of <br /> upcoming slurry seal and cape seal projects. Truman Avenue, Fairview Avenue, <br /> McGarvey, Farm Hill Blvd, Redwood Avenue, Bridge Parkway, Teredo Drive, and Vera <br /> Avenue will be slurry sealed later this year or next as part of another contract. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.