My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 64 <br /> ATTACHMENT2 <br /> (vi) Hydromodification management measures so that post-project <br /> stormwater runoff does not exceed the flow and duration of pre- <br /> project runoff, if required under the NPDES permit. <br /> b. The following additional information shall be submitted with the post- <br /> construction stormwater management plan: <br /> (i) Detailed hydraulic sizing calculations for each stormwater treatment <br /> measure proposed; and <br /> (ii) Pollutant removal information demonstrating that any proposed <br /> manufactured/ mechanical (i.e. non-landscape-based) stormwater <br /> treatment measure, when not used in combination with a <br /> landscape-based treatment measure, is capable of removing the <br /> range of pollutants typically removed by landscape-based treatment <br /> measures and/or the range of pollutants expected to be generated <br /> by the project. <br /> c. All proposed stormwater treatment measures shall incorporate appropriate <br /> planting materials for stormwater treatment (for landscape-based <br /> treatment measures) and shall be designed with considerations for <br /> vector/mosquito control. Proposed planting materials for all proposed <br /> landscape-based stormwater treatment measures shall be included on the <br /> landscape and irrigation plan for the project. The applicant is not required <br /> to include on-site stormwater treatment measures in the post-construction <br /> stormwater management plan if he or she secures approval from the City <br /> Engineer of an alternative proposal that demonstrates compliance with the <br /> requirements of the Provision C.3 of the National Pollutant Discharge <br /> Elimination System (NPDES) permit issued to the San Mateo Countywide <br /> Clean Water Program. <br /> d. Applicant shall enter into a Stormwater Treatment Measures Maintenance <br /> Agreement, in accordance with Provision C.3.e of the NPDES permit, <br /> which agreement shall provide, among other thing, that: <br /> (i) The applicant accepts responsibility for the adequate installation/ <br /> construction, operation, maintenance, inspection, and reporting of <br /> any on-site stormwater treatment measures being incorporated into <br /> the project until the responsibility is legally transferred to another <br /> entity; and <br /> (ii) The applicant provides and ensures legal access to the on-site <br /> stormwater treatment measures for representatives of the City, the <br /> local vector control district, and staff of the Regional Water Quality <br /> Control Board, San Francisco Region, for the purpose of verifying <br /> the implementation, operation, and maintenance of the on-site <br /> stormwater treatment measures and taking corrective action if <br /> necessary. The agreement shall be reviewed and approved by the <br /> ATTY/RES0.2263/APPROVING A PLANNED DEVELOPMENT PERMIT(FINGER AVE) <br /> REV:07-02-12 VR <br /> Page 15 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.