Laserfiche WebLink
8.A. - Page 65 <br /> ATTACHMENT2 <br /> City prior to recordation and recorded at the County Recorder's <br /> Office at the applicant's expense. <br /> 36.The applicant shall submit an Erosion and Sediment Control Plan to the City <br /> Engineer for review and approval prior to commencing any work on the <br /> project, including demolition or grading work. The Plan shall show Best <br /> Management Practices (BMPs) for storm water pollution prevention. <br /> Additionally, the plan shall include specific provisions for the protection of the <br /> creek from erosion, sediment, and construction debris. All construction work <br /> in connection with this project must conform to the approved Erosion and <br /> Sediment Control Plan. <br /> 37. Prior to commencing any work on the project, including demolition or grading <br /> work, the applicant shall post at all entries to the project site in clear view of <br /> the public right-of-way, a sign as required by RCMC Section 24.33 indicating <br /> the hours of construction and limitations on construction noise. Additionally, <br /> the sign shall include a phone number of the applicant's designated contact <br /> for complaints about problems with the construction activity. <br /> 38.The applicant shall be responsible for the cost of repairs to any improvements <br /> within the public right-of-way that are damaged during construction. The <br /> applicant shall submit documentation of the existing condition of Finger <br /> Avenue from the westerly extent of the project site to the intersection of <br /> Finger Avenue and EI Camino Real and the public improvements along the <br /> project's frontage, including but not limited to trees, tree grates, signs, light <br /> poles, drainage inlets, curbs, gutters, etc. to the satisfaction of the City <br /> Engineer prior to issuance of a grading or building permit. This survey shall <br /> be submitted to the City Engineer for review and approval. All damage shall <br /> be repaired to the satisfaction of the City Engineer at no cost to the City prior <br /> to the release of subdivision securities. Notwithstanding for the foregoing, all <br /> damage that is a threat to public health or safety, as determined by the City <br /> Engineer, shall be repaired immediately. <br /> 39. No materials or equipment shall be stored on the improved portion of any <br /> public roadway at any time. <br /> 40. Prior to the end of each work day during construction, the contractor or <br /> contractors shall pick up and properly dispose of all litter resulting from or <br /> related to the project, whether located on the property, within the public rights- <br /> of-way, or properties of adjacent or nearby neighbors. <br /> 41.The project is subject to the impact fees which were in effect and applicable <br /> to the project when the Vesting Tentative Map is submitted and found <br /> complete which include but are not limited to: traffic impact fees, school fees, <br /> water treatment fees, sewer fees, and parkland in-lieu fees. All such fees <br /> ATTY/RES0.2263/APPROVING A PLANNED DEVELOPMENT PERMIT(FINGER AVE) <br /> REV:07-02-12 VR <br /> Page 16 of 19 <br />