My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-79- <br /> 8.A. - Page 108 <br /> Exhibit A <br /> CEQA Findings of Fact <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> SIGrTIFICANT ENVIRONMENTAL IMPACTS <br /> The following findings, including impact statements, mitigatian measures, findings and facts in <br /> suppart of findings, are based on the fu11 administrative record, including, but not limited to, the <br /> Draft EIR, which contains a fialler discussion ofeach issue. <br /> Air uali <br /> Impact: Impact AIR — 1: The proposed praject would resuit in signifcant construction- <br /> related air quality impacts if the app�ican� failed to implement BAAQMD's basic <br /> construction mitigation measures. <br /> Mitigation: MM AIR - 1: The project includes the failowing construction practices to reduce <br /> construction c�ust/air quality impacts to a less than significant �evel. BAAQMD <br /> has prepared a list of feasible constructian dust contrad measures to reduce <br /> construction impacts to a level that is Iess than signif cant. The following <br /> constn.�ction practices shall be implemented during constrttction of the proposed <br /> project: <br /> • All exposed surfaces (e.g. parking areas, staging areas, soil piles, graded <br /> areas, and unpaved access roads) sha116e watered two times per day. <br /> • AlI haul trucks transporting soil, sand, or other loose material offsite shall <br /> be cavered. <br /> • Ail visi�le mud or dirt track-out onto adjacent public roads sha.�I be <br /> removed using wet pawer vacuum street sweepers at least once per day. <br /> The use of dry power sweeping is prohibited. <br /> • Sweep daiZy(with water sweepers) a�l paved access roads, parking areas <br /> and staging azeas at canstruction sites. <br /> • All vehicle speeds an unpaved roads sha2l be limited ta 15 mph. <br /> • Alt roadways, c�riveways, and sidewalks to be paved shall be completed as <br /> soon as possible. <br /> • Building pads shall be laid as soon as possible af�er grading unless seeding <br /> ar soiI binders are ttsed. <br /> • Ic�ling times shali be minimized either by siautting equipment ofi�when not <br /> in use or reducing the maximum idling time to f ve minutes (as required <br /> by the Californ2a air�orne toxics control measure Title 13, Section 2485 af <br /> ATTY/RES0.22531ATTACHMENT 1 FfNGER CERTIFYING FINAL EIR-PC <br /> REV:1D6-14-12 VR <br /> Pege 7 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.