My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-20- <br /> 8.A. - Page 109 <br /> California Coda Regu�ations [CCR�}. Clear signage shal� be provided for <br /> construction workers at al� access points. <br /> • All construction equipment sha1� be mairna,ined and properly tuned in <br /> accordance with manufacturer's specifications. AIl equipment sha11 be <br /> checkea by a certified mechanic and determined to be r�tnning in praper <br /> candition prior to operation. <br /> • Al� excavatian, grading, and/or demalition activities shalI be suspended <br /> when average vvind speeds exceed 20 mph. <br /> � Vegetative ground caver (e.g. fast-germinating native grass seed} shall be <br /> planted in distu,rbed areas as soon as possible and watered apprapriately <br /> ur�til vegetation is established. <br /> • The simultaneous occurrence of excavation, grading, and ground- <br /> disturbing constructian activities on the same area at any one time sha.11 be <br /> limited. Activities shalY be phased to reduce the amount of disturbed <br /> surfaces at any on� time. <br /> • A�l trucks and eyuipment, including their tires, shall be washed aff prior to <br /> leaving the site. <br /> • Sandbags or other erosion control measures shall be instal2ea ta prevent <br /> silt nznoff to public raadways from sites with a slope greater than one <br /> percent. <br /> • Past a publicly visib�e sign with the telephone number and person to <br /> contact at the Lead Agency regarding dust comp2aints. This person shall <br /> respond and take carrective action within 4$ hours. The Air District's <br /> phane number shal] also be visible to ensure compliance with applicable <br /> reguiations. <br /> Finding: Implementation of MM AiR — 2 would reduce construction-related air guality <br /> impacts to a less than significant level. <br /> Facts in Support af Finding: BA.AQMD's basic construction mitigation measures were <br /> developed as feasible methods to reduce construction-related aust and <br /> construction-equipment exhaust to acceptable levels, as described in Section 2.8 - <br /> Air Quality of the Draft EIR on pag�s 119-125, which is hereby incorporated by <br /> reference. <br /> Biolo 'cal Resaurces <br /> Impact: Impact BIO — 2: Protected birds and bats, and their nests, may be present in <br /> landscaping or structures on site, and could be impacted by tree removal or <br /> build�ng demolition duxing implementation of the proposed project. <br /> ATTYlRES0.2253/ATTACHMENT 7 FINGER CERTIPYING FINAL EIR-PC <br /> R�V;106-74-12 VR <br /> Page 8 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.