My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-33- <br /> 8.A. - Page 122 <br /> Mitigation: MM HYD � 6: The project shall install a stormwater treatment system so that <br /> runoff would be f ltered over a minimum of tw�nty-five {25} feet of vegetation or <br /> through o#her equivalent means and will not degrade water yuality before <br /> discharging into the City storm drain system and even#ually Cordilleras Creek. <br /> Prior to recordation of the final map, t}�e applzcant shaIl enter into an Operation <br /> and Maintenance Agreement, and provide a maintenance pian, with the City to <br /> ensure the ongoing operation and maintenance of treatment controls far the <br /> on-site drainage system. <br /> Finding: Implementation of MM HYD — 6 wauld reduce the project's impact on water <br /> qua�ity post-construction to a less than significant leve2. <br /> Facts in Support of Finding: Implementat�on of MM HYD — 6 would reduce the project's <br /> impact on water quality past-construction by complying with the NPDES permit <br /> that requires treatment measures to be incotparated into the project to reduce <br /> contaminants in surface runoff as t�escribed in Section 2.2 --Hydrology and Water <br /> Quality of the Draf� EIR on pages SO-63, which is hexeby incorporated �y <br /> reference. <br /> Noise <br /> Impact: Impact NQI — 1: Noise generating activities associated with demolition and <br /> construction at the project site wotald temporarily e�evate noise levels in the area <br /> surrounding the project site. <br /> Mitigation: MM NOI — 1: The project sha11 implement the following measures ta reduce the <br /> duration and valume of constructian noise: <br /> a. Limit construction to aaytime haurs (7:00 AM to 8:00 PM) Monday <br /> through Friday, with no constructron activities on weekends or halida.ys <br /> per Section 24.32 of the City of Redwoad City Municipal Code. <br /> 1�_ Construction activities or equipment shall not generate noise Ievels <br /> exceeding 1 I 0 aB{A) per Sec. 24.3] of t17e City of Redwood City <br /> Municipal Code. <br /> c. Utilize "quiet" models of air compressors and ather stationary noise <br /> sources where techno�ogy exists. <br /> d. Prohibi#unnecessary idling o#'internal combustion engine. <br /> ATTYIRES0.22531ATTACHMENT 1 FINGER C�RTIFYING FINAL EIR-PC <br /> REV:106-i4-�2 VR <br /> Page ZE vf23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.