My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-71- <br /> 8.A. - Page 160 AnACHMENT2 <br /> other construct�on-refated permif) shall contain a stormwater management <br /> plan, for review and appro�al by the City's Engineering Di�ision, to rnanage <br /> stormwater run-off and to �imit the discharge of pollutants in stormwater after <br /> canstruction of the project to the maximum extent practicable. <br /> a. The post-construction starmwa#er marragement plan shall include and <br /> identify t�e fo(lowing: <br /> (i) All proposed impervious surface on the site; and <br /> (ii) Anticipated direc#iona� flows of ar�-site stormwater runofF; and <br /> (iii) Site design meas�res to red�ace the amount of Fmpervious surface <br /> area and directly connected imperrrious surfaces; and <br /> (iv}Source control meastxres to limit the potentiaf for stormwater <br /> pollutiorr; and <br /> (v) Stormwater treatment measures to remove pallutants from <br /> stormwater runoff; and <br /> (vi)Hydromodification management measures so �hat post-project <br /> stormwater runoff does r�a# exceed the flow and duration of pre- <br /> project runoff, if required under the NPDES permit. <br /> b. The tollowing additional information shall be s�bmitted with fhe post- <br /> construction stormwater managemen# plan: <br /> {i) Detailed hydraulic sizing calculations #or each stormwater treatment <br /> measure proposed; and <br /> (ii} Pollutant removal information demanstrating that ar�y proposed <br /> manufactured/ mechar�ical (i.e. non-landscape-based} s#ormwater <br /> treatment measure, when r�ot used in combination with a <br /> landscape-based #reatment meas�re, is capabfe of removing the <br /> range af pollutants typically removed by landscape-based treatment <br /> measures and/or the range of pollutants expected to be generated <br /> by fhe project. <br /> c. AI! proposed stormwater treatment measures shall incorpora#e <br /> appropriate planting materials for stormwa#er treatment {for landscape- <br /> �ased treatment measures} and shall be des+gned with considerations <br /> for vector/mosquito control. Proposed planting materials for all <br /> proposed landscape-based stormwater treatment measures shall be <br /> included on the landscape ar�d irrigation plan for the projec#. The <br /> applicant is no# requi�ed to include on-site stormwater treatme�� <br /> measures in the post-cor�struc#ion stormwater management plan if he <br /> ar she secures appro�al from the City Engineer of an alternative <br /> proposal that demonstrates compliance wit� t�e requiremeRts af the <br /> Provision C.3 of the National Pollutant Discharge Elimination System <br /> {NPDES) permit issued to #he San Mateo Cauntywide Clean Water <br /> Program. <br /> ATTY/RE50.2254/ATTACHMENT 2 FINGER PIANNED pEVELOPMENT—PC <br /> REV:Q6-14-12 VR <br /> Paga 15 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.