Laserfiche WebLink
-72- <br /> Arr 8.A. - Page 161 <br /> d. Applicant shali enter into a Stormwater Treatment Measures <br /> Ma�ntenance Agreement, in accardance with Provision C.3.e of the <br /> NPDES permit, which agreement shafl pro�ide, among other thing, <br /> that: <br /> (i} The applicant accep#s responsi�ility for the adequate installatioN <br /> construction, operation, ma�ntenance, inspection, and reporting of <br /> any on-site stormwater treatment measures being incorporated into <br /> the project unti! the responsibility is legally tra nsferred to another <br /> entify; and <br /> (ii} The applicant provides and ensures (ega� access to the on-site <br /> stormwater treafinent measures for representatives of the City, the <br /> local vector control district, and staff of #he Reg ional Water Quafity <br /> Cor�trol Board, San Francisco Region, fof the purpose o� verifying <br /> the implementatFan, operation, and maintena nce of the on-site <br /> stormwater trea#ment measures and taking correc#ive action if <br /> �ecessary. The agreemer�t sha(I be reviewed a nd appro�ed by the <br /> City prior to recordation and recorded at the County Recarder's <br /> Office at the applica�t's expense, <br /> 36.T�e applicant shalf submit an Erosion and Sediment Control Plan to the City <br /> Engineer for review and appro�al prior to commencing any work on the <br /> project, ir�cluding demolition or grading work. The Plan shall show Best <br /> Management Practices (BMPs} for storm water pollution preventior�. <br /> Additionally, the plan shall include specific provisions for the protection of the <br /> creek from erosion, sedfinent, and constructior� debris. All construction work <br /> in conr�ection w�th this project must conform to the appro�ed Erosion and <br /> Sediment Contro! Plan. <br /> 37,Prior to commencing any work on #he project, inctuaing dernolition ar grading <br /> work, the applicant shall post at all entries to the project site in clear view of <br /> the public right-of-way, a sign as required by RCMC Section 24.33 indicating <br /> the hours of construction and limitations on construction noise. Addi#ionally, <br /> the sign shall include a phone number of t#�e applicar�t's designated con#act <br /> for complaints about problems with fhe construction activ�ty. <br /> 38.The applECant sha�l be responsible for the cost of repairs #o any improvements <br /> within the public right-of-way that are damaged during construction. The <br /> appiicant shafl submit docUmentation of the existing condition of Finger <br /> A�enue from the westerly extent of the project site to the intersection of <br /> Finger Avenue and EI Camino Real and the public improvements along the <br /> project's frontage, including but not limited to trees, tree grates, signs, fight <br /> poles, drainage inlets, curbs, gutters, etc. to the satisfaction of the City <br /> Engineer prior #o issuance of a grading or buElding permit. This survey shal! <br /> be submitted to the City Engineer for review and ap�roval. All damage sha�f <br /> ATTYIRES0.22541ATTACHMENT 2 FINGER PLANNEp REVELOPMENT—PC <br /> REV:06-14-12 VR <br /> Page 16 of 21 <br />