My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-07-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-07-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2012 9:27:35 AM
Creation date
7/5/2012 4:54:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
7/9/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.G. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> July 9, 2012 <br /> SUBJECT <br /> Award of Contract — 2011-2012 Sanitary Sewer Replacement Project <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the 2011-2012 Sanitary Sewer Replacement Project to Ranger Pipelines, Inc. of San <br /> Francisco, California for their responsive and responsible low bid of $885,660.00 and <br /> authorize the City Manager to increase the contract amount, if necessary, up to 10% of <br /> the amount awarded, not to exceed $974,226.00. <br /> BACKGROUND <br /> The city systematically replaces sections of aging sewer and water infrastructure to <br /> ensure the continued reliability of the system. Each year, staff identifies pipelines that <br /> required excessive maintenance or experienced repeated service disruptions and <br /> targets those pipelines for improvement. To prioritize pipe improvements, staff relies on <br /> another program that takes videotapes of the sewer lines annually. <br /> ANALYSIS <br /> CCTV inspection of Sanitary Sewer Basin No. 5E was completed in 2010. Staff's <br /> review of the inspection videos revealed numerous pipeline defects in this sewer basin. <br /> A number of construction options for repair/replacement, including traditional open <br /> trench and trenchless pipebursting techniques, have been evaluated by staff to <br /> determine the most cost-effective method of mitigation. A project combining both <br /> traditional and trenchless construction techniques minimizes disruption to residents and <br /> results in a cost-effective project. <br /> The proposed sanitary sewer replacement project will improve the condition of, and <br /> minimize infiltration and inflow into, the sewer collection system. This project will <br /> replace approximately 4,590 lineal feet of 6-inch and 8-inch vitrified clay pipe (VCP) <br /> sewer main with new 6-inch and 8-inch polyvinyl chloride pipe (PVC) and high density <br /> polyethylene (HDPE) pipe, 46 sanitary sewer manholes and 113 sanitary sewer laterals. <br /> Six (6) bids were received at the bid opening on June 27, 2012 and are summarized <br /> below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.