Laserfiche WebLink
City of Redwood Cit3 13roposal No. 03-187 <br />September 18, 2¢03 Page No. 9 <br /> <br />performed to evaluate whether it is feasible to stabilize the old slide area without encroaching omo <br />the lower lots along Farm Hill Blvd, which contain the bottom half of the slide and are not owned <br />by the City. This would require evaluation of various construction alternatives, and has not been <br />included in the scope of work or estimated fees. <br /> <br />Thank you for the opportunity to submit this proposal. If the content of this proposal meets your <br />approval, please provide written authorization for us to proceed, and we will start scheduling the <br />work as soon as possible. <br /> <br /> Sincerely, <br /> <br /> BAY AREA GEOTECHNICAL GROUP <br /> <br /> CA Geotechnical Engineer 854 <br />2 copies submitted. <br /> <br />Attachment: Proposed Boring Locations <br /> <br /> <br />