My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Bay Area Geotechn... (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Under $60K
>
Agmt03 Bay Area Geotechn... (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2008 3:03:18 PM
Creation date
12/1/2003 10:49:10 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Geotechnic Group
PROJECT NAME
soil evaluation at 929 & 949 Nob Hill Road
RMP File Number
304.5
Date
11/26/2003
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Redwood City Proposal No. 03-187 <br />September 18, 2003 Page No. 8 <br /> <br /> Supplies: grout, PVC pipe, Christy boxes, etc + 15% lump sum $1,100 $1,100 <br /> Field Engineer 18 hrs $90 $1,620 <br /> Project Engineer (incl. permit & work plan) 12 hrs $115 $1,380 <br /> Mileage 90 m $0.50 $45 <br /> Subtotal 1 $8,035 <br /> <br />2. Anticipated Laboratory TestinR <br />Saturated direct shear tests 10 ~ $60/test $600 <br />Direct shear tests ~ natural moisture content 10 ~ $50/test $500 <br />Multi-stage Triaxial CU-PP 1 ~ $805/test $805 <br />Residual Ring Shear Tests 6 ~ $230/test $1,380 <br />Moisture/density measurements 20 ~ $15/test $300 <br /> Subtotal 2 $3,585 <br /> <br />3. Env. ineering Analysis & Reoort Preparation <br /> Project Engineer, estimate 40 hrs $115 $4,600 <br /> Supervisory Engineer 4 hrs $130 $520 <br /> Drafting, estimate 4 hrs $50 $200 <br /> Clerical, estimate 4 hrs $40 $160 <br /> Subtotal 4 $5,480 <br /> <br /> I TOT~ ESTIMATED FEES $17,1oo] <br /> <br />BAGG reserves the right to transfer fees between tasks, as some tasks may take longer than <br />estimated and others may require less time. A total fee of$17,100, however, would not be exceeded <br />without prior consultation and negotiations regarding unanticipated subsurface conditions, the <br />drilling and well installation requiring more time than estimated above, or a change in the scope of <br />work outlined in this proposal. <br /> <br /> OTHER <br /> <br />We understand that the proper destruction of the existing (at least 2, and possibly 5), non-functioning <br />piezometers, in accordance with State and County Environmental Health requirements, are to be <br />performed at a later date. This work has therefore not been included in the scope of work proposed <br />herein. <br /> <br />Stability analyses perfmmed as part of the scope of work proposed herein would allow decisions to <br />be made regarding the need for and general nature of any remedial work to properly stabilize the <br />slide. If stabilization work is found to be necessary, additional stability analyses may have to be <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.