My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 MetalCraft Marine Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 MetalCraft Marine Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2013 11:52:51 AM
Creation date
7/12/2012 3:47:04 PM
Metadata
Fields
Template:
Agreement
Contractor Name
MetalCraft Marine Inc.
PROJECT NAME
Construction and purchase of MetalCraft Marine Firestorm 36 Model fireboat
RMP File Number
304
Date
6/26/2012
MO Ref
12-120, 13-134
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Jaws (Rescue Tool) 1 <br /> NFPA 1983 Rescue Rope <br /> 100ft l.lOft 2 <br /> Rope Throw Bags 75 ft 4 <br /> Tool Kit 1 <br /> Night Vision Portable 2 <br /> 2 1/2 Inflation Kit 2 <br /> Dry Suits MSD575 WR 2 <br /> Trauma Bag 1 <br /> ALS Bag 1 <br /> Oxygen bag 1 <br /> Suction 1 <br /> Intubation Kit 1 <br /> Burn kit 1 <br /> Ob Kit 1 <br /> Spinal Kit 1 <br /> E Bottle 02 2 <br /> Pediatric Kit 1 <br /> Stokes Litter 1 <br /> Floating Harness 0 <br /> Body Bags with Handles 2 <br /> Drug Box 1 <br /> IV Start 1 <br /> Thermometer 1 <br /> Airway Bag 1 <br /> Laryngoscope 1 <br /> C-Spine bag 1 <br /> WMD Box 1 <br /> Traurna Bag 1 <br /> Spare Supply Bag 1 <br /> Med Clip Board 1 <br /> Suction Unit 1 <br /> 3.15 Test and Trials: <br /> 3.15.1 The boat is to be used under emergency conditions. It will sometimes be subjected to <br /> severe operating conditions and equipment failures could conceivably result in loss of life or <br /> injury to firefighters or others. For this reason, the boat must pass these acceptance tests <br /> before being accepted for service by the Redwood City Fire Department. All acceptance tests <br /> shall be accomplished with a full load of fuel, equipment and crew(four personnel), because <br /> this boat will normally respond to emergencies with this loading. The Redwood City Fire <br /> Department shall witness all tests. The contractor shall provide at least twenty one (21) <br /> working day's notice before performing tests. <br /> 3.15.2 The contractor shall provide access for inspection by the Redwood City Fire <br /> Department prior to closure of void spaces. <br /> 3.15.3 Deck Trial Acceptance Test- Before sea trials are run, a test of all machinery and <br /> electronic equipment shall be made at the dock. The engines shall be run at 1500 rpm for at <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.