My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Community Sports Development Council, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Community Sports Development Council, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 2:53:09 PM
Creation date
7/23/2012 2:53:08 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Community Sports Development Council, Inc.
PROJECT NAME
Fuded and supported project: Scoocer Field- Synthetic Sports re-Surface-Fair Oaks Field Synthetic Turf Replacement project
RMP File Number
304
Date
7/18/2012
MO Ref
12-118
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� � ' ATNLETIC FIELD DEYELOPMENT P�OIECT <br /> SUPPORT SPOMSORSNIP&FUNDIN6 AGREEMENT dR�G��A� <br /> MEMO�ANDUM 0�UNDERSTANDIN6 <br /> BEiWEEN: Community Sports Development Councii, Inc. <br /> A Non Profit Funding & Sponsorship Alliance <br /> Referred to as "CSDC" <br /> AND: City of Redwood City <br /> Parks and Recreation. <br /> 650-780-7253 (Hereinafter referred to as "Recipient") <br /> Re: Funded&Supported Project: Soccer Field-Synthetic Sports Re-Surface <br /> CSDC Alliance Sponsorship& Support-2012 Funding Program <br /> The CSD Council, Inc. is a national alliance of manufacturers, non profit organizations, national corporate <br /> partners and key vendors and sponsors. CSDC and the Recipient have entered into discussions, design and <br /> planning to explore the potential to invite certain CSDC national alliance members to participate in the partial <br /> and like kind donation of critical components and services necessary for the manufacture, delivery and <br /> installation of new all weather synthetic athletic fields and track at the RecipienYs project location. <br /> Project Location: City of Redwood City, California <br /> These discussions and resulting invitations have been well received by the respective alliance members to the <br /> point that the CSD Council, Inc. has issued a"Project Approval Letter"to Recipient. That Project Approval <br /> Letter, has been transmitted to Recipient and calls for moving to the next step in this process by developing <br /> and executing this mutually agreeable Memorandum of Understanding that will provide a specific framework <br /> and process to move fonroard with the donation and installation of the above referenced synthetic sports fields. <br /> This Memorandum of Understanding is designed to allow the staff of Recipient to process the proper <br /> authorization and approval to move forward with this sponsored installation in a timely manner and process. It <br /> is anticipated that the process and framework for such installation will be as follows: <br /> 1. Agreement to Sponsor� Partial Donation . The CSD Council, supported by its applicable alliance <br /> members, hereby agree to draw up various individual material purchase orders& installation service order <br /> documents which will be transmitted to and approved by each of the participating CSDC alliance sponsors and <br /> suppliers who will be involved with this project. The terms and conditions within these documents will reflect <br /> the agreement of each alliance member to engage in and provide a like-kind partial donation of the <br /> sponsorship of necessary project materials and components that will be supplied and delivered to the project <br /> site. Each respective alliance member/sponsor will also sign and approve the Supply and/or Installation Order <br /> to lock in their respective commitments, at the appropriate time and prior to delivery and installation. <br /> I.Soccer Field Playing Surface:Preliminary size estimate: 72,000 square feet(+.)•To be confirmed <br /> $260,9801ntegrated 8�Installed Turf System,Crumb Rubber Infill 8�Install Contractor-All are like kind partial donations <br /> Break Down of your cost:Turf System Mill Production:$134,400+Turf Install Company:$92,020+Crumb Rubber$34,560 <br /> Note:7here may be minor adjustments once the final artwork configuration is determined and wastage is accounted for) <br /> $15,000 Standby Allowance for Site Work&Crushed Rock Base Repairs-Your project may need some site work done after the existing <br /> turf field has been removed from the project site. This potential cost can be minimized if the removal and demo of the old turf <br /> field is done with care as to not disturb the existing base.This$15k is an estimated allowance for a typical final grading. <br /> $275,980''Total Estimate and Cost Goal for Recipients Cost of Turf Installation+shipping from Georgia Mill (estimated at$6400) <br /> *These numbers are sponsored goals that have a good chance of being finalized provided only a minimal amount of site work is needed for base <br /> repairs. ft is also understood that the City of Redwood City will be responsible for the removal of the existing turf field. This is our best estimate <br /> based on the information the parties have at the time this MOU is signed.We will need to focus in on confirming and adjusting these numbers in <br /> the coming weeks. Also Note: The combine total sponsored size and cost shall be reflected on the attached"Addendum A-Preliminary Field <br /> Schematic Layouts"incorporated by reference to this MOU. <br />
The URL can be used to link to this page
Your browser does not support the video tag.