My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 David J. Powers & Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 David J. Powers & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2014 4:15:45 PM
Creation date
7/31/2012 4:42:18 PM
Metadata
Fields
Template:
Agreement
Contractor Name
David J. Powers & Associates, Inc.
PROJECT NAME
Traffic studies, 2323 Euclid - Cambridge Academy Project
RMP File Number
304.5
Date
7/31/2012
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> Consultant will prepare an Environmental Impact Report (EIR), in accordance with the <br /> CEQA Guidelines and the City's requirements, for the proposed Cambridge Academy <br /> Project. The EIR will provide an objective determination of the environmental impacts <br /> that could result from the proposed project. <br /> 1.0 PROJECT INITIATION, SCOPING, AND SCHEDULING <br /> Consultant will attend an initial kick-off meeting with the City and the project applicant to <br /> discuss the project and project plans, further refine the EIR Scope as needed, identify <br /> alternatives to the project, and coordinate the scheduling and preparation of the EIR. <br /> 2.0 PREPARATION OF THE EIR NOTICE OF PREPARATION <br /> Consultant will prepare the EIR Notice of Preparation (NOP), in accordance with the <br /> CEQA Guidelines and the requirements of the City. The NOP will include a brief project <br /> description and overview of the anticipated environmental impacts of the proposed <br /> project. <br /> Consultant will submit an electronic copy of the draft NOP to the City and revise it per the <br /> City's comments. After revisions are made, Consultant will email a PDF version of the <br /> NOP to the City for duplication and distribution. Responses to the NOP received during <br /> the 30-day NOP circulation period will be incorporated into the EIR. <br /> 3.0 PREPARATION OF ADMINISTRATIVE DRAFT EIR <br /> Consultant will prepare an Administrative Draft EIR (ADEIR) that will describe the <br /> significant environmental impacts resulting from construction and operation of the <br /> proposed project. The ADEIR will include a table of contents, summary, introduction, <br /> description of the project and environmental setting, an in-depth discussion of <br /> environmental impacts, and proposed mitigation measures and other feasible mitigation <br /> measures identified by the City or other interested persons or agencies. <br /> 3.1 EIR Summary <br /> The ADEIR will include a summary section consisting of a concise description of the <br /> proposed project, a brief narrative outlining the project's environmental impacts, and <br /> proposed mitigation measures. The summary will also describe the areas of public <br /> controversy and the alternatives to the project. <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO. 1 DAVID POWERS CAMBRIDGE ACADEMY EUCLID <br /> REV: 05-06-13 VR <br /> Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.