My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 David J. Powers & Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 David J. Powers & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2014 4:15:45 PM
Creation date
7/31/2012 4:42:18 PM
Metadata
Fields
Template:
Agreement
Contractor Name
David J. Powers & Associates, Inc.
PROJECT NAME
Traffic studies, 2323 Euclid - Cambridge Academy Project
RMP File Number
304.5
Date
7/31/2012
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pages of written comments on the Draft EIR (30 hours of Project Manager and five hours <br /> of Principal time). This scope assumes that no comments are received that require <br /> additional technical analysis. If additional time or technical analysis is required to <br /> respond to the comments, it can be provided as an extra work task, on a time and <br /> materials basis, in accordance with the attached fee schedule. <br /> One (1) electronic copy of the Administrative Draft FEIR (ADFEIR) will be submitted to the <br /> City for review. The ADFEIR will be revised per the comments received, and a PDF copy <br /> of the "Screencheck" FEIR will be prepared. Once the City approves the "Screencheck" <br /> FEIR, Consultant will reproduce up to 25 copies of the FEIR and deliver it to the City for <br /> distribution. A PDF copy of the FEIR will also be provided to the City in PDF format for <br /> posting on the City's website. <br /> 7.0 MITIGATION MONITORING OR REPORTING PROGRAM <br /> A Mitigation Monitoring or Reporting Program (MMRP) will be prepared for the project, <br /> consistent with the level of project information detail available. The MMRP will <br /> summarize the mitigation measures identified for all significant impacts, the responsible <br /> implementation agency, the monitoring phase, and the enforcement or monitoring <br /> agency. The Administrative Draft MMRP will be submitted for review to the City with the <br /> Administrative Draft FEIR. Upon revision, a PDF copy of the MMRP will be provided to <br /> the City for printing and posting on the City's website. <br /> 8.0 NOTICES AND FINDINGS <br /> Except for the NOP, this scope of work does not include preparing notices (e.g., Notice of <br /> Official Action, Notice of Determination, etc.). Nor does this Scope of Work include <br /> preparing Findings required under CEQA Section 15091 or a Statement of Overriding <br /> Considerations pursuant to CEQA Section 15093 (if required). <br /> 9.0 MEETINGS, HEARINGS, AND PROJECT COORDINATION <br /> This scope of work includes Consultant attendance at up to four project <br /> meetings/hearings (one kickoff meeting, one scoping meeting, two public hearings), and <br /> time for general project coordination. Phone and email communication will also be used <br /> to update the City on the progress of the environmental analysis and any outstanding <br /> issues to be resolved. <br /> 10.0 BUDGET <br /> The cost to complete the EIR process, as described above, is estimated not to exceed a <br /> maximum of $42,260.00, in accordance with the estimated budget provided below and <br /> attached fee schedule. All costs will be billed on a time and materials basis <br /> commensurate with work completed. Please note that the cost estimate shown below is <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO. 1 DAVID POWERS CAMBRIDGE ACADEMY EUCLID <br /> REV: 05-06-13 VR <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.