My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecD99 1999-134701
RedwoodCity
>
City Clerk
>
Recorded Docs 1985-1999 partial
>
1999
>
RecD99 1999-134701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 2:56:36 PM
Creation date
8/28/2012 2:55:24 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Shores Center Limited Partnership
PROJECT NAME
Development Agreement Pacific Shores Center
RMP File Number
304
Date
8/6/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> i �� <br /> 3. The Seaport Boulevard storm drain system shall be maintained by the City. . <br /> 4. The maintenance of the stoRn water pump station system and the 54' and <br /> 60' diameter pipes between the end of the perimeter channel at Seapo�t <br /> 8oulevard and the storm water pump station shail be administered by the <br /> �;ty, The cast of maintenance shall be shared proportionately, according to <br /> the amount of storm water disctiarge, between the City and the developme�t. <br /> The amounts of disctiarge and the cost share shall be deteRnined prior to the <br /> recordation of the first unit. The developer shail sign an agreement with the <br /> City which vviil reflect the parties' obligations. <br /> 5. The developer, prior to the recordation of the first unit, shall submit an <br /> agreement, signed and ready for recordation, between Cargiil and the <br /> developer whict� shall make arrangements for the use and maintenance cast <br /> of the perimeter ct�annel. The agreement shail limit Cargill's disct�arge of <br /> storm water into this channel to the capacity of the stoRn water pump station <br /> that the developer shall build. <br /> 6. The developer, prior to the recor�aental A ehncies th t'{will be needed ta <br /> necessary permits from all Govem 9 <br /> proceed with the canstruciion of this projeci. <br /> y E, SEVYER FAC�LITIES <br /> Y.. <br /> 1. The sewer facilities shail be designed accarding to the requirements of Part <br /> V1, Volume III of the Standards and the applicable Standard Details (Volume <br /> I I). <br /> 2. The sewec collection system shall be parivately owned and maintained to the <br /> sanitary sewer pump stations. <br /> 3. The City shall own and maintain tfie pumpos�ations and the forca main from <br /> the pump stations to the Manna Pump Stat <br /> 4. Th�N6erit�a Pump Station shall be enlarged, if it is nec,sssary, to take the <br /> di�a from this subdivision. <br /> F. WATER 04STR18UT10N <br /> 1, The water system shall be designed according�n�W t�he Standard Deta Is <br /> . of Volume Ill of the Standards and in comP <br /> (Volume II). <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.