Laserfiche WebLink
�� � <br /> �� � <br /> 3. During construciion, the City streets shail be cfeaned as often as required to <br /> remove any acc�,mulation of mud and debris resuiting from this construction. <br /> if import or expo�t of di�t is necessary, the developer shall obtain an approval <br /> for the hauling route from the Engineering Division. The hauiing routes shail <br /> be siriciiy adhered to by the deve�ope�s subcontradors. <br /> C. STREETS <br /> 1. Both, public and private streets shall be designed� according to the <br /> � requirements of Part Iii , Volume II( of the Standards, and in accordance with <br /> the applicable Standard Details (Voiume II). <br /> 2. The streets and parking places (if any) adjacent to the streets within the <br /> subdivision shall be a private street system and it w+il be so designated on <br /> the final subdivision map. <br /> 3. Assurance shall be given by the developer to the City, in a form satisfadory <br /> to the City Attomey, that the vehic�lar circvlation system shall remain <br /> irrevocably as "private streets°, and that the maintenance of suct� circ�latiort <br /> system, incfuding pavement, pavement markings, tra�c and strest signs, <br /> street lights, and acrxssories, storm drain system and accessories, shall be <br /> �� <br /> the responsibility of the Owners' Association. The City of Redwood City will <br /> s maintain the water lines to the water meters and the sanitary sewer fores <br /> � main from the pump stations to the Marina Pump Station and the two onsite <br /> pump stations.Ti�e deciaration of this requirement shall be made part of the <br /> Covenants, Conditions and Restnctions. <br /> . The Private Street System begins from the easieriy p�jB ion of the nortfieriy <br /> right-0f-way line of the one way road between Lots A <br /> 4. Tiie public sVeet portion of Seaport Boulevard and the existing road, <br /> designated as "Frontage Road' shall be aiostrvcted and improY�ed to the <br /> satisfadion of Engineerirg and Construction. The construction of Seapo�t <br /> Boulevard begins approximately 200' west of the cente�iine interse�tions af <br /> ge�poct Court and Seaport Bouievard. <br /> D. STORIi�QRN� <br /> 1. The stoRn drain system shall be designed in ac,cardano me1 Part V, Volume <br /> III of the Standards and applicable Standard Detads (V ) <br /> • 2. The stoRn drain system within the subdivision to the outlet points and to the <br /> storm water pump station shail be maintained by the Owners' Assxiation. <br /> z <br />