My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Pacific Shores Center
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Pacific Shores Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 3:04:06 PM
Creation date
8/28/2012 3:04:01 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Shores Center
PROJECT NAME
Development Agreement for Pacific Shores Center
RMP File Number
304
Date
10/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> /� <br /> 3. Tl�e Seaport Boulevard storm drain system shail be maintained by the City. <br /> 4. The maintenance of the storm water pump station system and the 54' and <br /> 60' diameter pipes between the end of the perimeter channel at Seaport <br /> 8oulevard and the storm a a�S�atmbessharedsp o`portio artelyS accord ngho <br /> �ity. The cast of mainten <br /> the amount of storm water disct�arge, between the City and the development. <br /> The amounts of discharge and the cost share shall be deteRnined prior to the <br /> recordation of the first unit. The developer shall sign an agreement with the <br /> �;ty whict� wiil reflect the parties' obligations. <br /> 5. The developer, prior to the re o da e�rdat on, between� Cargill U ndt the <br /> agreement, signed and ready <br /> develo pec which shall make arrangements for the use and maintenance cost <br /> of the perimeier ctiannel. The agreement s ha i l limi t Car gi i l's d i s r.f i a r g e o f <br /> stoRn water into this channel to the capacity of the stoRn water pump station <br /> that the developer shall build. <br /> 6. The developer, prior to the rer�r�aental A ehnc:es that'{will be needed aa <br /> necessary permits from all Govem 9 <br /> proc�ed with the construciion of this project. <br /> y E, SEVYER FAC�LITIES <br /> �.. <br /> 1. The sewer faciiities shail be designed�ac�id��9' St ndad IDeta Ist(Volume <br /> VI, Volume III of the Standards and pP <br /> II). <br /> 2, The sewer colleciiort system shall be parivately owned and maintained to the <br /> sanitary sewer pump stations. <br /> 3. The City shall own and maintain the pump stations and the forc8 main from <br /> the pump stations to the Marina Pump Station. <br /> 4. Th�N�r�t'►a Fump Station shall be enlarged, if it is necessary, to take the <br /> di�e from this subdivision. <br /> F. WATEFt DISTRlBUTION <br /> 1, The water system shall be designed according��o�W{�he Standard Deta's <br /> . of Volume Ill of the Standa�ds and in comP <br /> (Volume II). <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.