My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 3 <br /> 4. Loss of Lot 6 is not acceptable, nor is loss of any of the nine proposed lots. <br /> 5. If there is a determination to impose the alternate street design and loss of Lot 6 <br /> such that residual property is created, the developer would consider sale of the <br /> land. The definition of fair market value would have to be agreed to before the <br /> value is determined. <br /> Results <br /> Neither party found new middle ground nor areas of acceptable compromise, based on <br /> the points noted above. Near the conclusion of the session, the discussion shifted to <br /> options involving the sale of all or a portion of the property. This topic was first <br /> broached with the concept of eliminating the northernmost entry into the site, in <br /> exchange for a single drive at the south. This concept, proffered by the neighborhood, <br /> and studied to some degree in the EIR creates a small remnant parcel immediately <br /> adjacent to and north of Mr. Ponti's property. Also, depending upon the design of the <br /> roadway termination, this could result in the removal of Lot 6 from the subdivision, also <br /> creating remnant land. As part of the negotiations, Mr. Ponti and the neighborhood <br /> were asked if they would consider buying the remnant land. They agreed in concept, as <br /> did Mr. McGowan, if the property were to be so reconfigured. The distinction between <br /> both sides is the valuation of the property. Subsequent to the facilitated discussion, the <br /> neighborhood engaged the services of an appraisal group to assist them in <br /> understanding how the property would be valued and what that value might be. As of <br /> this writing, the results of this analysis and discussion are unknown. <br /> Building off this initial discussion, an alternative raised in the EIR analysis was <br /> discussed. In this instance the single entry point would be at the northern boundary, <br /> where the current entry is depicted, but the road would not be a loop. In this scenario, <br /> the potential for three lots fronting on Finger Avenue could be developed. Lot 6 is also <br /> lost in this scheme. The basis of raising this option was at the request of the <br /> neighborhood to consider the sale of this land (the property that would run from Mr. <br /> Ponti's property line south to the southern property boundary of the development site) to <br /> a third party. Mr. McGowan was willing to consider this option, as well, assuming the <br /> value could be agreed upon. <br /> Finally, there was discussion about the concept of a third party buying the entire <br /> development site. Mr. McGowan indicated he was willing to talk with anyone willing and <br /> able to pay an appropriate value for the property. A meeting was held between Mr. <br /> McGowan and a potential purchaser of some or all of the property, but no agreement <br /> was reached to move forward with the discussions or establishing a purchase price. <br />
The URL can be used to link to this page
Your browser does not support the video tag.