Laserfiche WebLink
8.A. - Page 9 <br /> WHEREAS, the Final EIR was published and made publicly available on June 8, <br /> 2012; and <br /> WHEREAS, on June 19, 2012, the Planning Commission held a duly noticed <br /> public hearing on the Finger Avenue Project, including the Final EIR, and recommended <br /> that the City Council (1) certify the EIR, adopt the necessary CEQA Findings, and adopt <br /> a Mitigation Monitoring and Reporting Plan in accordance with CEQA, by Resolution <br /> No. 12-16; and (2) strongly consider approval of the alternative identified in the Final <br /> EIR as the "Project with 25 Foot Creek Setback Alternative," without (a) increasing <br /> home sizes elsewhere in Lots 1-4, (b) reducing front yard setbacks or driveway aprons, <br /> or (c) removing heritage trees other than those (10 trees) already proposed for removal <br /> by the Project applicant, by Resolution No. 12-19; and <br /> WHEREAS, the "Project with 25 Foot Creek Setback Alternative" is similar to the <br /> Project as proposed by the developer except that the residences on Lots 1-4 would be <br /> setback 25 feet from the top of creek bank and reduced in size by 187 square feet for <br /> Lot 1, 348 square feet for Lot 2, 95 square feet for Lot 3 and 87 square feet for Lot 4 (for <br /> a total building reduction of 720 square feet). With the "Project with 25 Foot Creek <br /> Setback Alternative", the Lot 3 residence, which previously required an exception to <br /> allow 40.9% (55 sq. ft.) lot coverage where 40% lot coverage is the standard per Zoning <br /> Article 5, would also no longer need an exception to the City's lot coverage standard. <br /> The recommended Project Alternative would thus only require exceptions to lot size for <br /> sloping lots, building setbacks and to the City's private roadway engineering standard; <br /> and <br /> WHEREAS, a notice of the City Council's public hearing on the Finger Avenue <br /> Project, including the Final EIR, was mailed on June 27, 2012 and duly published in the <br /> Redwood City Daily News on June 29, 2012, and the City Council held a public hearing <br /> on the Finger Avenue Project on July 9, 2012; and <br /> WHEREAS, on July 9, 2012, the City Council continued the public hearing to a <br /> date certain (September 10, 2012) and directed the Developer and the neighborhood <br /> groups to try to find an equitable solution, with the assistance of the City Manager and <br /> Community Development Director; and <br /> WHEREAS, on September 10, 2012, the City Council held the continued public <br /> hearing and certified the Final EIR prepared by the City in accordance with the <br /> requirements of CEQA and, based on the EIR, adopted a Mitigation Monitoring and <br /> Reporting Program in compliance with all CEQA requirements. <br /> NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br /> OF REDWOOD CITY AS FOLLOWS: <br /> 1. The above recitals are true and correct and together with the Staff Report <br /> and the application materials, including without limitation the Final EIR, vesting tentative <br /> ATTY/RES0.2783/CC FINGER RESO CERTIFYING FINAL EIR <br /> REV:08-31-12 VR <br /> Page 3 of 42 <br />