Laserfiche WebLink
8.A. - Page 63 <br /> ATTACHMENT2 <br /> SWRCB and prepare a stormwater pollution prevention plan (SWPPP) for <br /> review and approval by the City's Engineering Division. <br /> 36.Applicant shall comply with the requirements of Provision C.3 of the National <br /> Pollutant Discharge Elimination System (NPDES) permit issued to the San <br /> Mateo Countywide Clean Water Program. The applicant shall submit with the <br /> application for a building permit (or other construction-related permit) a <br /> completed Construction-Permit-Phase Stormwater Supplemental Form to the <br /> Building Official. The project drawings submitted for the building permit (or <br /> other construction-related permit) shall contain a stormwater management <br /> plan, for review and approval by the City's Engineering Division, to manage <br /> stormwater run-off and to limit the discharge of pollutants in stormwater after <br /> construction of the project to the maximum extent practicable. <br /> a. The post-construction stormwater management plan shall include and <br /> identify the following: <br /> (i) All proposed impervious surface on the site; and <br /> (ii) Anticipated directional flows of on-site stormwater runoff; and <br /> (iii) Site design measures to reduce the amount of impervious surface <br /> area and directly connected impervious surfaces; and <br /> (iv) Source control measures to limit the potential for stormwater <br /> pollution; and <br /> (v) Stormwater treatment measures to remove pollutants from <br /> stormwater runoff; and <br /> (vi) Hydromodification management measures so that post-project <br /> stormwater runoff does not exceed the flow and duration of pre- <br /> project runoff, if required under the NPDES permit. <br /> b. The following additional information shall be submitted with the post- <br /> construction stormwater management plan: <br /> (i) Detailed hydraulic sizing calculations for each stormwater treatment <br /> measure proposed; and <br /> (ii) Pollutant removal information demonstrating that any proposed <br /> manufactured/ mechanical (i.e. non-landscape-based) stormwater <br /> treatment measure, when not used in combination with a <br /> landscape-based treatment measure, is capable of removing the <br /> range of pollutants typically removed by landscape-based treatment <br /> measures and/or the range of pollutants expected to be generated <br /> by the project. <br /> c. All proposed stormwater treatment measures shall incorporate appropriate <br /> planting materials for stormwater treatment (for landscape-based <br /> treatment measures) and shall be designed with considerations for <br /> ATTY/RES0.2784/FINGER RESO APPROVING PD FINAL <br /> REV:08-31-12 VR <br /> Page 15 of 20 <br />