My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 64 <br /> ATTACHMENT2 <br /> vector/mosquito control. Proposed planting materials for all proposed <br /> landscape-based stormwater treatment measures shall be included on the <br /> landscape and irrigation plan for the project. The applicant is not required <br /> to include on-site stormwater treatment measures in the post-construction <br /> stormwater management plan if he or she secures approval from the City <br /> Engineer of an alternative proposal that demonstrates compliance with the <br /> requirements of the Provision C.3 of the National Pollutant Discharge <br /> Elimination System (NPDES) permit issued to the San Mateo Countywide <br /> Clean Water Program. <br /> d. Applicant shall enter into a Stormwater Treatment Measures Maintenance <br /> Agreement, in accordance with Provision C.3.e of the NPDES permit, <br /> which agreement shall provide, among other thing, that: <br /> (i) The applicant accepts responsibility for the adequate installation/ <br /> construction, operation, maintenance, inspection, and reporting of <br /> any on-site stormwater treatment measures being incorporated into <br /> the project until the responsibility is legally transferred to another <br /> entity; and <br /> (ii) The applicant provides and ensures legal access to the on-site <br /> stormwater treatment measures for representatives of the City, the <br /> local vector control district, and staff of the Regional Water Quality <br /> Control Board, San Francisco Region, for the purpose of verifying <br /> the implementation, operation, and maintenance of the on-site <br /> stormwater treatment measures and taking corrective action if <br /> necessary. The agreement shall be reviewed and approved by the <br /> City prior to recordation and recorded at the County Recorder's <br /> Office at the applicant's expense. <br /> 37.The applicant shall submit an Erosion and Sediment Control Plan to the City <br /> Engineer for review and approval prior to commencing any work on the <br /> project, including demolition or grading work. The Plan shall show Best <br /> Management Practices (BMPs) for storm water pollution prevention. <br /> Additionally, the plan shall include specific provisions for the protection of the <br /> creek from erosion, sediment, and construction debris. All construction work <br /> in connection with this project must conform to the approved Erosion and <br /> Sediment Control Plan. <br /> 38. Prior to commencing any work on the project, including demolition or grading <br /> work, the applicant shall post at all entries to the project site in clear view of <br /> the public right-of-way, a sign as required by RCMC Section 24.33 indicating <br /> the hours of construction and limitations on construction noise. Additionally, <br /> the sign shall include a phone number of the applicant's designated contact <br /> for complaints about problems with the construction activity. <br /> ATTY/RES0.2784/FINGER RESO APPROVING PD FINAL <br /> REV:08-31-12 VR <br /> Page 16 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.