Laserfiche WebLink
8.A. - Page 82 <br /> ATTACHMENT3 <br /> 34. No improvement work shall be commenced until plans and specifications <br /> have been approved by the appropriate City official whose approval is <br /> required for the improvement work. Improvements shall be installed in <br /> accordance with the approved plans and specifications, to permanent line and <br /> grade, to the satisfaction of the City Engineer who shall have such work <br /> inspected. All work shall be subject to such inspections as the City Engineer <br /> deems necessary. All improvements shall comply with the current design <br /> standards and the standard specifications of the City in effect at the time of <br /> approval of the improvement plans unless exceptions have been granted. The <br /> burden of proof shall lie with the applicant to show, to the satisfaction of the <br /> City Engineer, that alternate designs, materials and specifications are equal <br /> to such standards or specifications. All grading and/or major vegetation <br /> removal in connection with the subdivision shall conform to the provisions of <br /> RCMC Section 30.90. Prior to approval of the improvement plans, the <br /> applicant shall provide copies to the City Engineer of "will-serve" letters from <br /> all utility companies that will provide utilities to the Project. <br /> 35.An Address Plan shall be submitted for review and approval by the Chief <br /> Building Official or designee prior to the issuance of building permits. If a <br /> name for the private roadway is proposed, it will be subject to review and <br /> approval by the City Council in conjunction with action on the Final Map. <br /> Plans submitted for building permits for each house shall include the location <br /> of the property address posted on site. Numbers shall be illuminated, no less <br /> than four inches in height, and of a color contrasting with the background <br /> color of the surface on which they are attached. The location, size and color <br /> shall allow clear visibility from the public street. <br /> 36.Applicant shall obtain coverage under the General Construction Activity Storm <br /> Water Permit (General Construction Permit) issued by the State Water <br /> Resources Control Board (SWRCB), file a notice of intent (NOI) with the <br /> SWRCB and prepare a stormwater pollution prevention plan (SWPPP) for <br /> review and approval by the City's Engineering Division. <br /> 37.Applicant shall comply with the requirements of Provision C.3 of the National <br /> Pollutant Discharge Elimination System (NPDES) permit issued to the San <br /> Mateo Countywide Clean Water Program. The applicant shall submit with the <br /> application for a building permit (or other construction-related permit) a <br /> completed Construction-Permit-Phase Stormwater Supplemental Form to the <br /> Building Official. The Project drawings submitted for the building permit (or <br /> other construction-related permit) shall contain a stormwater management <br /> plan, for review and approval by the City's Engineering Division, to manage <br /> stormwater run-off and to limit the discharge of pollutants in stormwater after <br /> construction of the Project to the maximum extent practicable. <br /> ATTY/RES0.2785/FINGER RESO APPROVING VTM FINAL <br /> REV:08-31012 VR <br /> Page 14 of 20 <br />