My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 101 <br /> ExxrBrT a <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PRO.TECT <br /> SIGNIFICANT ENVIRONMENTAL IMPACTS <br /> The following findings, including impact statements, mitigation measures, ftndings and facts in <br /> support of findings, are basec! on the full administrative record, incl�ding, but not limited to, the <br /> Draft EIR, vvhich contains a fuller discussion of each issue. <br /> Air aali <br /> Tmpact: Impact AIR�-1: The proposed project would result in signiftcant construction- <br /> related air quality impacts if the applicant failed to implement BAAQMD's basic <br /> construction rnitigation measur�s. <br /> Mitigation: MM AIR- 1: The project includes the fo�lowing construction practices to reduce <br /> canstruction dustlair quality impacts to a less than significant le�el. BAAQMD has <br /> prepared a list of feasible construction dust control measures to reduce construction <br /> impacts to a level that is ]ess than significant. The following canstruction practices <br /> shall be imptemented during construction af the proposed project: <br /> • All exposed surfaces(e:g. parlcing areas, staging areas, soil piles, graded <br /> areas,and unpaved access roads}shall be watered two times per day. <br /> � All haul trucks transporting soil, sand, or other loose material o#�site shall be <br /> covered. <br /> • All visibEe mud or dirt track-out onto adjacent public roads sha12 be removed <br /> using wet power vacuum street sweepers at least once per day. The use of <br /> dry power sweeping is prohibited. <br /> • Sweep daily(r�vith water sweepers)all paved access roads, parking areas and <br /> staging areas at construc#ion sites. <br /> � All vehicle speeds or� unpaved roads shall be ]imi#ed to 15 mph. <br /> * AlI roadways, driveways, and sidewalks to be paved shall ba completed as <br /> soon as possible. <br /> • B�tilding pads shall be laid as soan as possib3e after grading unless seeding or <br /> soil binders are used. <br /> + Idling times shall be minimized either by shutting equipment off when nat in <br /> use or reducing the maximum idling time to five minutes (as rec�uired by the <br /> Cali�ornia airborne toxics control measure Title 13, 5ectian 2485 of <br /> California Code Regulations [CCR]). C�ear signage shall be�ravided far <br /> cons�ruction workers at all access points. <br /> � All construction equipment shall be maintained and properly t�.ined in <br /> aecordanca with manufacturer's specifications. All equipment shall be <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.