Laserfiche WebLink
8.A. - Page 102 <br /> checked by a certified mechanic and determined to be running in proper <br /> condition prior to operation. <br /> • All excavation,grading, and/or demolition activitias shall be suspended when <br /> average wind speeds exceed 20 mph. <br /> � Vegetative ground cover(e.g. fast-germinating native grass seed) shall be <br /> planted in disturbed areas as soon as possible and watered appropriately until <br /> vegetation is esiablishad. <br /> • The simuttaneaus occurrence of excavatian, grading, and graund-disturbing <br /> construction activities on the same area at any one Yime shall be ]imited, <br /> Activities shall be phased ta reduce the amount of disturbed surfaces at any <br /> one time. <br /> � All trucks and e�uipment, including their tires, sha]] be washed o#�prior to <br /> leaving the site, <br /> � Sandbags or other erosion control measures shall be installed to prevent silt <br /> runoff to�ublic roadways from sites with a slope greater than one percent. <br /> + Post a publicly�isible sign with the telephone number and person to contact <br /> at the Lead Agency regarding dust complaints. This person si�all respond and <br /> take corrective action wit�in 48 hours. The Air District's phone number shall <br /> also be visible to ensure compliance with applicable regulations. <br /> �'inding: Implementation of MM A[R— ] would reduce construction-related air quality <br /> impacts to a less than signifcant fevel. <br /> Facts in Su�port of Finding: BAAQMD's basic construction mitigation measures were developed <br /> as feasible methods to reduce construction-reiated dust and construction-equipment <br /> exhaust to acceptabEe levels, as described in Section 2.8 - Air Quality of the Draft <br /> EIR on pages 119�125,which is hereby incorporated by reference. <br /> Biolo ical Resources <br /> Impact: Impact BIO--2: Protected birds and bats, and their nests,may be present in <br /> 2andscaping or structures on site, and could be impacted by tree removal or building <br /> demolition during implementation of the proposed project. <br /> Mitigation: In compliance with the Migratory Bird Treaty Act and the California Fish and Game <br /> Code,the following measures shal] be implemented during the constr�ction of the <br /> praject to reduce and avoid constr�action-related impacts to nesting raptors, migratory <br /> birds, and/or bats: <br /> MM BIO�2.1: Preconstruction nesting bird surveys shall be conducted by a <br /> qualified wildlife biologist within two weeks of demolitionlconstructian activities <br /> scheduled to take place batween February 1 and July 31 (breeding season). All trees <br /> within the project area shall be survzyed. If active raptar or passerine nests are <br /> , <br />