My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 105 <br /> be preserved in a h�aithy state, the Arborist sha11 require replacement of any <br /> tree remaved with another tree or trees in the same general location as the <br /> damaged tree. The number of trees adequate to co�n�ensate for the ]oss of the <br /> tree that is removed shall be determined by the Arborist. <br /> 6. All debris created as a result of any tree removal work shall be removad by <br /> the project applicant from the property within two weeks of debris creation, <br /> and such debris sha11 be properly disposed of by the applicant in accordance <br /> with al� applicable laws, ordinances, and regulations. <br /> 7. [n the event that any ofthe existing trees do not survive within fve years after <br /> the subdivision completion and it is confirmed by a cartified arborist that the <br /> trees were damaged primarily due to construction impacts ofthe project,then <br /> the homeowners association shall be responsible to replace the damaged trees <br /> to the satisfaction of the City. <br /> 8. Prior to the commencement of any construction activity on the project site, <br /> the Arborist shall inspect the tree�rotection measures rec�uired to be in place <br /> before the start of construction to ensure that they have been completely and <br /> properly installed. <br /> 9. The Arborist shal] conduct period inspections throughout the construction on <br /> the site to verify that the tree protection measures outlined in the Tree <br /> Protection Plan are being followed. <br /> 10. Prior to the conveyance of any lot, and prior to the release of the subdivision <br /> financial guarantees, the Arborist shall inspect the indiviclual lot and the <br /> overal� project, respectively, to confirm that all tree protection measures, <br /> incl�ding any post construction requirements, such as aeration,mulch beds, <br /> and fertilization, have been satisfactori3y completed. <br /> 11. Root Pruning. During and upon campletion of any trenching/grading <br /> operation within a tree's dripline, shauld a�y roots greater than one inch (1") <br /> in diameter be damaged, broken ar severed, raot pruning to incIude flush <br /> ct�tting and sealing of expased roots should be accomplished under the <br /> supervision af a qualified Arborist to minimize root deterioratian beyond the <br /> soi! fine within twenty-four hours. <br /> 12. Aruning. Aruning of the foliar canopies to include removal of deadwood is <br /> recomrr�ended and shauld be initiated prior to construction aperations. Such <br /> pruning will �rovide any necessary eonstructian clearance, wi11 lessen the <br /> likelihaod or potential for littab br0akage, reduce `windsail' effect and provide <br /> an environment suitable far healthy and vigorous growth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.