My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 106 <br /> 13. �'ertilization. A program af fertilizativn by means of deep root soil injection is <br /> recommended with apptications in spring and surnmer for those trees to be <br /> impacted by construction. Such fertilization will serve to stimulate feeder root <br /> deve3opment,of-tset shock/stress as related to construction and/or <br /> environmenta] factors, encourage vigor, alleviate soit compaction ancf <br /> compensate for any encroachment of natural feeding root areas. Inception of <br /> this fertilizing program is recommended prior to the initiation ofconstruction <br /> activily, <br /> 14. [rrigation. A suppiemen�al irrigation pragram is recommended for all trees <br /> (excluding oa�C species)and should be accomplished at regular three to four <br /> week intervals during the period of May 1 through 4ctober 31. Irrigation is <br /> to be applied at or about the `dripline' in an amount sufficient to supply <br /> approximately fifteen(15)gallons ofwater for each inch in trunk diameter. <br /> Irrigation can be provided by rn�ans of a soil needle, `soaker' or permeable <br /> hose. When using `soaker' or permeable hoses, water is to be run at low <br /> pressure, avoiding runoff/pudd�ing, alrowing the needed moisture to penetrate <br /> the soii to fe�der root depths. <br /> 15. Mulch. Muiching with wood chips(maximum d�pth three feet}within trea <br /> environments(outer foliar perimeter)wilt �essen moisture e�aporatian frorr� <br /> soi�, protect and encourage adventitious roots and minimize passi6le soi] <br /> compaction. <br /> Finding: Implementation of MM BTO-�4 would reduce impacts ta existing�rees to be <br /> preserved to a less than significant]evel. <br /> Facts in Sup�o�-t of Finding: Imple►nentation of MM BIO—4 would reduce impacts to existing <br /> trees to be preserved by imp3err�er�ting tree protection measures, as described in <br /> Section 2.6—Biological Resources of the Draft EIR on pages 92-144, and Section IV <br /> —Appendices of the First Amendment to the Draft EIR, Appendix A Tree Survey <br /> datad February 10, 2012 by Kevin Kielty, Certified Arborist WE#0475A, which are <br /> hereby incorparated by reference. <br /> Cultura!Resources <br /> Impact: Irnpact CUL—2: While the project would not result in a significant impact to the <br /> Finger Farm Hause setting, which has already been compromised when the farm was <br /> remaved,the project has the potential to cause indirect adverse changes to the Finger <br /> Farm House's setting thraugh the introd�tction of new visual elernents in the vicinity <br /> of the structure. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.