My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-09-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-09-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2012 5:16:54 PM
Creation date
9/6/2012 4:57:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/10/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 107 <br /> Mitigation: MM CUL—2: The project ap�licar�t shall install screening vegetation along the <br /> project site's westerly property line that within 2 years wili reach a minimum height <br /> of]6 f�et and which shall be of a species type, as indicated in Figure 2.1-5 <br /> Prefiminary Landscape Plan, that wil� comp]ete2y block views ofthe entire project <br /> from the adjacent Finger Farrn House year-round. <br /> Finding: Irnplementation ofMM CUL—2 would furCher reduce indirect impacts to the <br /> adjacent Finger Farm House below a less than significant level. <br /> Facts in Support of Finding: Implementatian of MM CUL—2 would screen the new homes with <br /> vegetation pianted along the praperty line so that the homes would not substantially <br /> contribute to the Finger Farm House setting as described in Section 2.t —Cultural <br /> Resources of the Draft EiR on pages 32-49, which is hereby incorporated by <br /> reference. <br /> Impact: Impact CUL—4: Future development under the proposed project could result in the <br /> exposure ar destruction af subsurface archaeological resources. <br /> Mitigation: MM CY7L--4: A qualified professional shall prepare and implement a Cultural <br /> Resources Managemen�Plan (CRMP)to ensure that the proposed praject would <br /> not cause a substantial adverse change in the significance of an archaeological <br /> resource. The P1an shall include the following elements: <br /> • The project applicant sha�l iclentify a qualified archaeologist prior to any <br /> demolition, excavation, or canstruction. The City shal� approve the selected <br /> archaeoiogist prior t4 issuance af the grading permit. The project <br /> archaeologist shall attend the pre-gtading meeting to discuss how to <br /> recognize archaeological resources in the soil during grading aciiviti�s. The <br /> prirne construction contractor and any subcontractor{s) shall be cautioned on <br /> the legal and/or regulatory implications of knowingly destroying cult�ral <br /> resources ar removing artifacts, human remains, and other cultural materials <br /> from the project site. <br /> • The archaeologist shai] perform spot check monitoring during gading and <br /> subsur�'ace construction and watch for and evaluate artifacts or resaurces that <br /> may be uncaverecl. The archaeologist shall aiso have the authority to <br /> temporarily haIt excavation and construction activities in the immediate <br /> vicinity(within a SO-meter radius)of a find if significant or potentially <br /> significant cultura] resaurces are exposed and/or adversaly afi'ected by <br /> construetion operations. Reasonable time will be allawed for the qualified <br /> archaeologist to natify the proper authorities for a more detailed inspection <br /> and examination af the expased cultural rasources. During this time, <br /> excavation and construction wauld not be allowed in the irr�mediate vicinity <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.