Laserfiche WebLink
8.A. - Page 109 <br /> activities, by ensuring they are treated with respect and care in accardance with state <br /> law, as described in Saction 2.1 —Cultura� Resources of the Draft EIR on pages 32- <br /> A9, which is hereby incorpnrated by reference. <br /> Impact: Impact CUL—b; It is possible that unknown paleontological rasources could exist <br /> an the site and cauld be damaged during construction of the propased project. <br /> Mitigatian: MM CUL—6: A qualified paleantologist shall be retained by the project to ensure <br /> that any resources encountered during construction are appropriately co�lected and <br /> documented: <br /> • The project applicant shall identify a qua7i�ed paleontologist prior ta any <br /> excavation or construction. The City shal] approve the selected paleontologist <br /> prior to issuance of the grading permit. The project paleontologist shal] attend <br /> the pre-grading meeting to discuss how to recognize paleontological <br /> resources in the soii during grading activities. The prime construction <br /> contractor�and any subcontractor{s) shall be cautioned on the legal and/or <br /> regu�atory implications of knowingly�estroying paleontological resources or <br /> remaving paleontologica] resources from the project site. <br /> • If paleontological resources are encauntered during the course of site <br /> developmen#activities, work in that area shall be halted and the project <br /> paleontologist shall be notified of the find. The project paleontologist shal] <br /> have the authority to temporarily divert or redirect grading to allow time to <br /> evaluate any exposed fossil rnaterial. Ifthe project paleontologist determines <br /> that the resource is significant, the project paleontologist shall properly <br /> callect any scientifically significant specimens. During col2ection activities, <br /> contextual stratigraphic data snall also be co�lacted. The data will include <br /> Eithologic descriptions, photographs, measured stratigraphic sections,and <br /> �eld notes. Scientifically significant specimens shall be prepared to the point <br /> of identification (not exhibition), stabilized, identified, and offered for <br /> curation to a suitab3e repository#hat has a retrievable storage system, such as <br /> the University of California, Berkeley, Museum of Paleantology. <br /> • The project paleantologist shall pr�pare a final report at the end af the <br /> earthmoving activities; the report shall include an itemized inventory of <br /> r�covered fossils and appropriate stratigraphic and locality data. The project <br /> paleontologist shall send one copy af the report to the City; another copy shal] <br /> accompany any fassils, along with field logs and photographs,to the <br /> designated repository. <br /> Finding: Implementation of MM CUL—6 would reduce impacts to unkno� buried <br /> �aleontological resources to a less than significant level. <br /> Facts in Support of Finding: Implementation of MM CUL—6 would reduce impacts ta unknown <br /> buried paleontological resources, if encountered during ground disturbing <br /> 9 <br />