Laserfiche WebLink
8.A. - Page 110 <br /> construction activities, by in�orming construction personnel involved wlth site <br /> clearing and grading that there is a potential far discovery of pa]eontalogica2 <br /> materials,educating canstructrton personnel on indicators of paleontologicaI deposits, <br /> and by ensuring they are appropriateiy collected and documented by a qualified <br /> pa�eontologist, as describecf in Section 2.1 —Cultural Resources of the Draf}EIR on <br /> pages 32-49,which is hereby incorporated by reference. <br /> Geolo�v and Sails <br /> Impact: Impact G�O-2: The soils an the site are susceptible to tiquefaction. Deve�opment <br /> of lands subject to liquefaction represents the patential to expose people or structures <br /> to potential st�bstantial adverse efFects, including the risk of loss, injury, or death. <br /> Mitigation: MM GEO--2: Devetopment of the proposed project in compliance with a final site- <br /> specific, design-]evel geotechnica! report will ensure that construction of the <br /> proposec� project would not expose people or structures to patential substantial <br /> adverse efFects from seismic-related ground failure, including liquefaction, <br /> Prior to issuance of a grading or building permit,the project applicant shall subrnit to <br /> the City for review and approval a fina� site-specifc,design-level geotechnical <br /> repor�,to be prepared by a licensed professional. The geotechnical report shal] <br /> include recommendatians for grading, avoidance of settlemant,the effects of <br /> expansive soiIs,and differential settlement of infrastructare and buildings. The report <br /> shall also identify the specific design parameters for foundations systems to ensure <br /> that such systems r�vi11 not be affected by liquefaction that could occur on the site. <br /> Building plans submitted to the City s3�a11 incorporafe the faundation design <br /> parameters identified in the evaluation. <br /> Finding: Implementation of MM GE��-2 would reduce impacts frorn liquefaction to a less <br /> than significant level. <br /> Facts in Suppart of Finding: Implementation of MM GEO—2 would reduce the proj�ct's impacts <br /> from liquefaction by preparing the site soils and designing the project to negate the <br /> impacts of liquefactian, as described in Section 2.3 —Geology, Soils, and Seismicity <br /> of the Draft EIR on pages 64-75, �vhich is hereby incorparated by reference. <br /> Impact: Impact GEO—3: Structtires set back less than 30 feet fratt� creek toe of bank are at <br /> risk from sudden bank failure. A small partion of the home proposed on Lot 3 wauld <br /> encroach within 30 feet of the toe of bank. As proposed, strUCtures on proposed Lots <br /> l, 2, ar�d 4 wauld be sited a minimurn �f30 feet from the toe oft�e creek bank. <br /> Mitigation: MM GEO—3: The strUCture on Lot 3 is sited less than 30 feet from the toe of the <br /> Cordilleras Creek embankment, therefore the faundation shall be supported on a <br /> lo <br />