Laserfiche WebLink
8.A. - Page 112 <br /> Finding: Tmplementation of MM GEO—4 would reduce impacts from bank erasion to the <br /> project to a Iess than significant level. <br /> Facts in Sugpart of Finding: Re-vegetating a creek ba�k with native vegetation is a recognized <br /> method for stabilizing and supporting a cre�k bank subject ta erosion, and therefore <br /> Implementation of MM GEO—4 w�uld reduce impacts to the project from erosion, <br /> as described in Section 2.3 —Geology, Soils, and Seismicity of the Draft EIR on <br /> pages 64-75, which is hereby incorporated by reference. <br /> Hazards and Hazardous Materials <br /> Imgact: Impact HAZ—1: Dernolition of the existing structur�s could expose on-site <br /> constructian warkers and other sensifive receptors adjoining the project site ta <br /> asbestos containing rnaterials and lead-based paint during dernolition activities. <br /> Mitigation: MM HAZ—1: Prior to cammencing the demoIition of the buildings on the project <br /> si�e, the applicant shall demonstrate compliance with Section �9827.5 of the <br /> California Health and Safety Ordinance Title 17 regarding the presence of asbestos in <br /> the buildings and the California Cocla af Regulations(CCA), Division l, Chapter 8: <br /> Accreditation, Certification, and Work Practices for Lead-Based Paint and �,ead <br /> Hazards in the buildings. <br /> Finding: Implementation of MM HAZ— 1 would reduce impacts during demalition activities <br /> from asbestos containing materials and lead-based paint to a less thar� significant <br /> ]e�val. <br /> �acts in Support of Finding: Trnptementation af MM HAZ— 1 would ensure that any building <br /> materials containing lead-based paint anc�/or asbestos would be hand�ed and disposed <br /> of by qualified construction personnet in compliance with state healt� and safety <br /> regulations, as described in Appendix C of the Draft EYR, (Finger Avenue Nine-Lot <br /> Planned Devetopment Initial Study/Mitigated Negative Declaration, November 2008, <br /> pages 40-43),which is hereby incorporated by reference, <br /> Irr�pact: Impact HAZ—2: Construction activities woutd include the temporary anc� short� <br /> term transport and hand�ing of various construction materials tha#are classified as <br /> hazardous materials(e.g.,diesel fiael, oil, gasoline, and architectural coatings}. <br /> Mitigation: MM HAZ—2: The primary contractor respansible far construction shall prepare a <br /> safety}�lan. The safaty plan shall include measures to reduce and minimize accidents <br /> I' <br />