Laserfiche WebLink
8.A. - Page 113 <br /> on-site{housekeeping), and measures that address the proper procedures to clean up <br /> and contain spills. The safety plan shall be approved by the City's Bt�ilding <br /> Department prior to the start of construction activity on the site. <br /> FiRding: Implementation of MM HAZ—2 wouId reduce impacts during construction activities <br /> from hazardous construction materials to a less than significant level. <br /> Facts in Support of Finding: Implementation of MM HAZ—2 wauld ensure that any construction <br /> materials classifted as hazardous materials would be safely handled by construction <br /> personnei and that any acci�ental spills are contained and cleaned up, as described in <br /> Appendix C of the Draft EIR, (Finger Avenue Nine-Lot Planned Development Initial <br /> Study/Mitigated Negative Declaratian, Navember 2008, pages 40-43),which is <br /> hereby incorporated by reference. <br /> Hvdrolo�v and Water Qualitv <br /> Impact: Impact HYD—S: The project wauld increase the amoua�t of impervious surfaces on <br /> the project site,thereby increasing tha amount of urban runaffto Cordilleras Creek <br /> and San Frar�cisco Bay. <br /> Mitigation: MM HYD—S: The project developer shall implernent a stormwater drainage plan <br /> during constructian and post-construction, approved by the City in conformance with <br /> appticable state and federal requirements. Prinr to sUbmittal of a grading permit to the <br /> City Engineer for review and approval, or such other site improvement permit that is <br /> a requisite prior to the start af project site grading,the applicant shal� prepare a <br /> Stormwater AofEution Prevention Plan (SWPPP)that is consistent with applicable <br /> requirements and regulations. The SWPPP shall be appro�ved by the City Engineer <br /> cancurrent with the a�proval of a grading perinit, or such other sita itnprovement <br /> permit that is a requisite priar to the start of praject site grading. <br /> k'inding: Implementation af MM HYD—5 would reduce the project's impacts to Cordilleras <br /> Creek from increased urban runoffto a less than significant level. <br /> Facts in S�pport of Finding: Implementation of MM HYD—5 wauld ansure that r�anof�from the <br /> �roject's increased impervious surface area(a net increasa of 2,2 I 1 sq.ft.) would be <br /> apprapriately managed on site and not exceed the capacity af the axisting or planned <br /> stormwater drainage system, as described in Section 2.2—Hydrology and Water <br /> Quality of the Draft EIR on pages 50-63, which is hereby incorporated by reference. <br /> Impact: Impact HYD—6: The project would create or contribute runaf�water which has the <br /> potentia3 to provide substantial additional sources of polluted runaff or that co�zld <br /> 13 <br />