Laserfiche WebLink
Table 1-Itemized Fee <br /> Estimate <br /> Phase II EnvironmentalSite <br /> Assessment <br /> 1306 Main <br /> Street Redwood <br /> City,California <br /> September 2012 <br /> u sequen i e - n eri or u -s a apor amp ing an esting <br /> Site visit and Coordina6ng Site Access for <br /> Interior Study <br /> PrincipalEngineer 1 hours@ $215 /hr $215 <br /> Projectll 8 hours@ $160 /hr $1,280 <br /> Vehicle 4 hours@ $12 /hr $48 <br /> SubSlab Soil-Uapor Probe lnstallation <br /> Principal Engineer hours@ $215 /hr $215 <br /> Project II 2 hours@ $160 /hr $320 <br /> Staffl 12 hours@ $120 /hr $1,440 <br /> Vehicle 8 hours@ $12 /hr $96 <br /> Drilling Contractor-Sub-slab Vapor Samping day@ $3,000 !day $3,000 <br /> Meter/Shroud day@ $350 !day $350 <br /> Soil VaporSampling Equipment <br /> 1L Summa Canister 5 fee@ $42 /ea $210 <br /> 10a200 ml/mn Flav Reg�l ator 5 fee@ $30 /a� $150 <br /> Sample Shipping to Lab 1 fee@ $400 /day $400 <br /> Analysis of Sub-slab Vapor Samples(Assumes 3 plus 1 duplicate,1 trip blank) <br /> VOCs (TO-15) 5 each @ $190 /ea $950 <br /> Fixed Gases(EPA3C) 4 each@ $205 /ea $820 <br /> Leak Chedc Compound 4 each@ $100 lea $400 <br /> Data Evaluation <br /> Principal Engineer 2 hours@ $215 /hr $430 <br /> Projectll 8 hours@ $160 /hr $1,280 <br /> Staff I 4 hours@ $120 /hr $480 <br /> Total $12,084 <br /> ATTY/AGR/139/1306 MAIN STREET PHASE II ENVIRONMENTAL SITE ASSESSMENT <br /> REV:09-07-12 VR <br /> Page 73 of 13 <br />