Laserfiche WebLink
Table 1•Itemized Fee Estimate <br /> Phase II Environmental Site Assessment <br /> 1306 Main Street Redwood <br /> City, California <br /> September 2012 <br /> InitialSite Studv£6oil and Groundwater Sam(!linq and Testinp <br /> Site visit and Coordinating Site Access for Initial Study <br /> Princpal al Eng neer 1 hours@ $215 /hr $215 <br /> Projectll 8 hours@ $160 /hr $1,280 <br /> Vehicle 4 hours@ $12 /hr $48 <br /> Planning and Permitting <br /> Underground Utility Locator 4 hoirs@ $175 /hr $700 <br /> City Permits(Bond,Feesand Inspection) $3,000 <br /> CountyDrilfngPermit(Feeandlnspection) 1 permit $750 /ea $750 <br /> Principal Engineer(QA/QC Project Ranning) 2 hoi.rs @ $215 Ihr $430 <br /> Projectll(prepare and coordinate permi t pacakges) 8 hours@ $160 Ihr $1,280 <br /> Staff I (mark borings,site mapprep,deliverpermits,USA,HSP) 8 hours@ $120 mr $960 <br /> Vehicle 8 hours@ $12 mr $96 <br /> Shc and Groundwater Phobe Installation and Sampling <br /> Principal Engineer 1 hours@ $215 /hr $215 <br /> Projectll 8 hours@ $160 /hr $1,280 <br /> Staffl 12 hours@ $120 /hr $1,440 <br /> Vehicle 8 hours@ $12 Ihr $96 <br /> Field Supplies PID fee $29tea $250 <br /> CoringContractor 4 hours@ $175 /hr $700 <br /> DrillingContractor day@ $3,700 /day $3,700 <br /> Materials $500 <br /> IDW Management and Non-Haz Material Disposal 2 drums $250 /ea $500 <br /> Analysis of Soil Samples <br /> TPHg(801518260) 6 each @ $SSlea $330 <br /> TPHdandTPHmowithsilicaga� cleanup(8o15) 6 each@ $85 /ea $510 <br /> VOCs(8260) 6 each@ $115 /m $690 <br /> 17T�Ie22Metals(6010/7471} 2 each@ $130 /a� $260 <br /> L�d(6010) 6 each@ $35 /aa $210 <br /> Solublemetal tests(2) $450 <br /> Analysis of Groundwater Samples <br /> TPHg(80198260) 3 each@ $55 /� $165 <br /> TPHdandTPHmowithsilicagelcleanup(8o15) 3 each@ $85 /ea $255 <br /> VOCS(8260) 3 eaCh @ $115 /ea $345 <br /> Data Tabulation, Review and Evaluation <br /> Pnc�pal al Engi neer 4 hours@ $215/hr $860 <br /> Projectll 8 hours@ $1601hr $1,280 <br /> Staffl 8 hours@ $1201hr $960 <br /> Investigation Completion Report <br /> Principal Engi neer 4 hours@ $215 hr <br /> $860 <br /> Projectll 30 hours@ $16dhr $4,800 <br /> Clerical 6 hours@ $85 /hr <br /> $510 <br /> Drafting 4 hours@ $l0�hr $420 <br /> Total $30,345 <br /> ATTY/AGR/139/1306 MAIN STREET PHASE II ENVIRONMENTAL SITE ASSESSMENT <br /> REV:09-07-12 VR <br /> Page 72 of 13 <br />