My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 Moore, Iacofano, Goltsman, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Moore, Iacofano, Goltsman, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2013 9:55:24 AM
Creation date
9/26/2012 8:18:37 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Moore, Iacofano, Goltsman, Inc.
PROJECT NAME
Review of 2003 EIR re differences between previous and current Pete's Harbor proposal.
RMP File Number
304.5
Date
9/25/2012
MO Ref
13-168
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Administrative Draft Revised Addendum will contain only the information <br /> necessary to make the 2003 EIR adequate for the project as revised, so that the <br /> reader can clearly identify new information; the Revised Addendum will not be <br /> redundant. <br /> For the Revised Addendum, Consultant will replace all project plan graphics in the <br /> previous Addendum with the most current corresponding project plans supplied by the <br /> applicant. Please note that the applicant has not revised the Shade Analysis diagrams <br /> (Plan Sheets A-12.1 and A-12.2, which are dated Sept. 20, 2012). Because the project <br /> site plan has changed (although slightly), Consultant's suggest that the applicant <br /> prepare revised Shade Analysis diagrams for consistency with the most recent site <br /> plan. <br /> Although not anticipated, if the CEQA evaluation reveals a new significant <br /> environmental impact or a substantial increase in the severity of a previously identified <br /> significant impact, or if a new mitigation measure is required which is considerably <br /> different from those identified in the 2003 EIR, Consultant will inform the City <br /> immediately to discuss how to proceed (e.g., Addendum with further project <br /> modifications, Mitigated Negative Declaration, Supplemental EIR). <br /> Ten (10) copies plus an electronic copy of the Administrative Draft will be provided to <br /> City staff. <br /> Task 3. Prepare Screencheck EIR Revised Addendum No. 2 <br /> The foundation for Task 3 was already established during preparation of previous <br /> Addendum No. 2. <br /> Consultant will prepare a Screencheck Revised Addendum based on: (1) City staff <br /> concurrence that the Administrative Draft findings are consistent with CEQA <br /> Guidelines section 15164 (Addendum to an EIR or Negative Declaration)--i.e., an <br /> Addendum does represent the proper CEQA approach; and (2) comments from City <br /> staff on the Administrative Draft. Prior to publication, an electronic version of the <br /> Screencheck will be provided to City staff for final review and approval. <br /> Task 4. Prepare Published EIR Revised Addendum No. 2 <br /> Based on City staff comments/approval of the Screencheck, Consultant will make <br /> necessary final revisions to complete the Revised Addendum, and thirty (30) copies <br /> plus an electronic version of the published Revised Addendum will be delivered to <br /> the City. <br /> Task 5. Attend Workshops, Meetings, and Hearinqs <br /> Consultant will attend up to: (a) two (2) public workshops, (b) two (2) meetings with <br /> City staff to discuss the Revised Addendum, and (c) four (4) Planning Commission <br /> and/or City Council hearings. At the workshops and hearings, Consultant will assist <br /> City staff in presenting the Revised Addendum and answering questions. <br /> REV: 09-05-13 VR <br /> ATTY/AGR/2013/AMENDMENTS/AMEND NO. 1 MIG PETE'S HARBOR <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.