My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 V & A Consulting Engineerings, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 Under 60K
>
Agmt12 V & A Consulting Engineerings, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2012 10:04:04 AM
Creation date
10/4/2012 10:04:04 AM
Metadata
Fields
Template:
Agreement
Contractor Name
V & A Consulting Engineerings, Inc.
PROJECT NAME
Inspection, testing and evaluation of cathodic protection for the recycled water system in RW Shores
RMP File Number
304.5
Date
10/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Consultant shall measure and record the position of the cathodic protection stations within <br /> Redwood City using a Trimble GeoXT GPS receiver with sub-meter accuracy. <br /> Task 3- Evaluation Report <br /> Consultant shall prepare a technical memorandum with an overview of the test methods, <br /> tabulate the field data and interpret the results of the evaluation. Consultant shall provide <br /> recommendations for repairs and annual maintenance of the cathodic protection system as <br /> required. <br /> Consultant shall calculate the remaining life of the cathodic protection anodes. The anode <br /> life calculations shall be used to provide recommendations for repair and/or replacement of <br /> the anodes that allows the city to accurately budget for the required work. Consultant shall <br /> submit a draft report for the city's review and comment. Consultant shall review comments <br /> from the city and shall incorporate the comments into the draft report and submit a final <br /> report to the City. <br /> Deliverables: <br /> Consultant shall deliver to the city a technical memorandum summarizing survey results and <br /> recom mendations. <br /> TIME SCHEDULE: <br /> Work of this agreement shall be completed within 24 days from receiving notice to proceed <br /> from city. <br /> Day <br /> Task/ <br /> ACtIVI �Cf CO I� o� O� � � � � � � � � N N N N N <br /> Notice to <br /> Proceed �J: <br /> Project <br /> Kickoff <br /> Meetin <br /> Field �,� � ����:_:: <br /> Testin "'-" # z ,_ <br /> Draft �� � � ��, � <�_ , , <br /> Technical � ;`��`����������a � ��� <br /> Memo `� � `� z��.��� <br /> City Review �.� � � ,=„�,� <br /> fi <br /> Final �� ���" �� �� <br /> Technical ""� <br /> ���' <br /> Memo ��� ., ����«: <br /> ATTY/AGR/2012.150N&A CONSULTING ENGINEERS <br /> REV:09-10-12 VR Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.