My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-10-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-10-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:44:22 PM
Creation date
10/4/2012 4:59:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/8/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.F. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> October 8, 2012 <br /> SUBJECT <br /> Award of Contract — Fire Station No. 9 HVAC Replacement <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the Fire Station No. 9 HVAC Replacement Project to S&H Construction, Inc. of Fremont, <br /> for their responsive and responsible low base bid of $142,500 and authorize the City <br /> Manager to increase the contract amount, if necessary, up to 10% of the amount <br /> awarded. <br /> BACKGROUND <br /> Fire Station No. 9 was constructed in 1987; the three rooftop HVAC units have reached <br /> the end of their useful lives and need replacing. Encon Engineering, a Mechanical <br /> Engineering consultant, prepared plans and specifications to replace the units. <br /> ANALYSIS <br /> The project includes three rooftop mounted units, modification of the existing ducting <br /> system, and installation of zone dampers to better control and improve energy savings. <br /> The City has applied to PG&E for Energy Rebates for this project and is awaiting <br /> PG&E's review and consideration. <br /> Five (5) bids were received at the bid opening on September 5, 2012 and are <br /> summarized in the table below. <br /> Bidder Total Bid <br /> S & H Construction -- Fremont $142,500.00 <br /> Pullman Construction -- Middleton $167,000.00 <br /> Beals Martin -- Redwood City $212,404.00 <br /> Cold Craft, Inc. -- Campbell $246,800.00 <br /> Cal-Pacific -- Pacifica $277,972.00 <br /> Engineer's Estimate $145,000.00 <br /> Recommended Bidder: S & H Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.