My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2012-10-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2012
>
AgdaPkt 2012-10-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:44:22 PM
Creation date
10/4/2012 4:59:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/8/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 23 <br /> o DI5CUS5 whether implications of the project triggering the expansion or <br /> construction of new infrastruct�re ar facilities. <br /> Consultant Deliverables: <br /> � One elec#ronic copy of Administ�-ati�e Draft 1 in MS Word <br /> • One electronic copy of Administrati�e Draft I in Adobe PDF format <br /> City Involvement: Re�iew and comment an Administrati�e Draft I. <br /> Task 4. CEQA Recommendat�ons <br /> Purpose: Provide a recommendatian to the City on the most appropriate ievel of CEQA <br /> rer�iew required for the proposed project. Provide a scope, �udget, and schedule for the <br /> next phase of the CEQA r��iew, if necessary. <br /> Discussion: At this stage, Consultant will recommend how to proceed with the CEQA <br /> pracess, depending on the findings from the Administra�i�e Draft 1S I. !f significant and <br /> unavoidable impacts are identified and an EIR is required, the City may ar may not <br /> choose to go through t�e steps to prepare the subsequent IS drafts (Administtati�e Draft <br /> IS II as described in Task 5). If all impacts can �e mitigated #o a iess-than-significant <br /> level, then an Administrative Draft II, Screencheck, and Final ISIMND wifl be prepared, as <br /> outlined in Task 5. <br /> Task 5_Administra#ive Draft IS llLFinal_Screencheck. and Puhlic Draft IS/MND <br /> Purpose: Co�sultant #o prepare an Administrative Draft IS li in response to City <br /> comments on Administrative Draft IS I, the Final Screencheck, and the Public Draft <br /> IS/MND. <br /> Discussion: Consultant wilf prepare an Adminisfrative Draft II to respond to the City's <br /> comments on Administrative Draft I. FoRawing, based on comments received from City <br /> stafF, Cansul#ant will re�ise the Ad�ninistrative Draft II as necessary and prepare a <br /> Screencheck primarily to veri�fy tha# the City's comments have been addresset! and <br /> incorporated into the document Based on the analysis provided in Adm�nistra#ive Draft IS I <br /> and II, and recommendations firom Consultat�t regarding CEQA review as outlined in Task <br /> 4 above, Consultant will prepare a final Screencheck, and #he Draft IS/MND for public <br /> re�iew unless the City determines #hat the preparation of an Environmental Impact Repart <br /> is required. If the City determines that a� EIR is required, Cansultant will prepare and <br /> submit to the City for review a subsequent scope af services tor preparatian of an EIR. <br /> AssumptJons: The level of effort �s variable and dapends on Ciiy comments on the <br /> Administrative Draft L in addition, comments submitted during the community outreach <br /> meeting could be considered during this task. The level of effort included in the cost <br /> estimate reflects th�e duratian of#he task, the a�aila�le time to turnaround the reports, and <br /> m�nor comments from City staff and mem�ers of the publfc/commenting age�cies. During <br /> those periods when Cansultar�t is responding ta comments an Administrati�e Draft I, <br /> Admin�stra#i�� Draft If, and the Screencheck, we exp�ct to be fu�ly engaged and committed <br /> at#he hours es#imated to meet the schedule deadfines. <br /> ATTY/AGR12012.154/2R HOUR CONTRACTlATKINS NORTHAMERICA <br /> REV:09-19-12 JS <br /> Page 21 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.