Laserfiche WebLink
application for submittal by the City and update the SWPPP accordingly with the 95°/o <br /> design plans. <br /> Deliverables: Draft Caltrans encroachment permit application, one hard copy of the <br /> 95% SWPPP, one hard copy half-size set of the 95% plans, one hard copy of the 95% <br /> technical specifications, and one hard copy of the 95% construction cost estimate. <br /> Task 5.3 - 100% Final Design PS8�E <br /> Work performed under this task shall incorporate comments from the 95°/o PS&E and <br /> shall include the completion and delivery of the following items: <br /> a. Update Caltrans encroachment permit application <br /> b. Final SWPPP <br /> c. Final plans, specifications, and engineer's estimate <br /> d. Contact bid documents (signed and stamped plans and specifications). <br /> Deliverables: Update Caltrans encroachment permit application, two hard copies of the <br /> final SWPPP, five hard copies full-size reproducible sets of 100% construction plans <br /> (signed), five hard copies half-size sets of 100% plans (signed), five hard copies of the <br /> 100% technical specifications, one PDF of final construction cost estimate, one PDF of <br /> final cost estimate, contract documents, technical specifications, and three digital copies <br /> of the drawings and documents in CAD, PDF, and microstation formats. <br /> Task 6 — Construction Support <br /> Consultant shalL <br /> a. Assist with the review and preparation of responses for requests for information <br /> during the bidding process <br /> b. Attend construction kick-off ineeting <br /> c. Conduct five (5) site visits during construction at appropriate stages <br /> d. Assist with the review and preparation of responses to contractor submittals, <br /> shop drawings, and change orders for compatibility with design <br /> e. Participate in final inspection and assist with punch list of deficiencies <br /> f. Prepare "record drawings" of the undercrossing construction based on red-lined <br /> drawings from the contractor <br /> g. Construction support with Caltrans project close out procedures. <br /> h. Provide geotechnical construction observations and testing as needed <br /> Deliverables: Original Mylar set of plans signed and sealed by the registered civil <br /> engineer, an electronic version (native format and PDF) of the plans, and final as-built <br /> files and any topographic base mapping within the State's right of way to be provided in <br /> .dgn (Microstation) format. <br /> ATTY/AGR/2012.151/WRECO <br /> REV:09-27-12 JS <br /> Page 13 of 16 <br />