Laserfiche WebLink
FEE SCHEDULE: <br /> ro�ect eam <br /> Subtotal Subtotal <br /> Task.Task Descri tion Fee Hours <br /> PHASEI <br /> 1 PROJECT HICK-OFF <br /> Field Review $ 1,091.50 11 <br /> Review Existing Documents $ 1,845.00 19 <br /> Subtotal � 2 936.50 30 <br /> 2 TOPOGRAPHICAL SURVEYING/UTILITY LOCATION <br /> Supplemental Topographical Survey $ 2,795.00 17 <br /> Subtotal $ 2 795.00 17 <br /> 3 PRELIMINARY DESIGN <br /> Develou Design Base Map $ 855.00 8.5 <br /> Preliminarv Plans $ 545.00 5 <br /> CEpA/Environmental Clearance $ 13,810.00 137 <br /> Provide Support for Permitting Effort $ 1,600.00 16 <br /> Subtotal $ 16 810.00 166.5 <br /> Phase I Subtota 22 541.50 213.5 <br /> PHASE II <br /> 5 CONSTRUCTION DOCUMENTS <br /> 5.1 65%Plans $ 7,952.00 78 <br /> 65%Specifications $ 1,868.00 15 <br /> 65%Cost Estimate $ 653.00 6 <br /> 65%Draft SWPPP $ 1,050.00 10 <br /> Internal QA/OC $ 735.00 5 <br /> 5.2 95%Plans $ 5,917.00 57 <br /> 95°/o Specifications $ 1,192.00 10 <br /> 95%Cost Estimate $ 653.00 6 <br /> 95%SWPPP $ 425.00 4 <br /> Internal pA/QC $ 735.00 5 <br /> 5.3 100%Plans $ 3,527.00 33.5 <br /> 100%Specifications $ 992.00 8 <br /> 100%Cost Estimate $ 545.00 5 <br /> 100%SWPPP $ 425.00 4 <br /> Internal QA/QC $ 735.00 5 <br /> Subtotal $ 27,404.00 251.5 <br /> 6 CONSTRUCTION SUPPORT <br /> Prepare Responses to RFIs $ 695.00 6 <br /> Conduct Site Visits(5) $ 246.00 2 <br /> Review Shop Drawings/Change Orders $ 368.00 3 <br /> Prepare Final Review/Punchlist $ 468.00 4 <br /> Prepare Record Drawings $ 705.00 7 <br /> Subtotal � 2,482.00 22 <br /> Phase II Subtot 1$ 29,886.00 273.5 <br /> OTHER DIRECT COST <br /> Travel $ 100.00 <br /> Reproduction $ 930.00 <br /> TIY�AG�/�Q����IlI�,�NTS/AMEND NO. 1 WRECO $ 1,150.00 <br /> �� � � ODC Subtot 1$ 2,180.00 <br /> Total Project Co $54,607.50 487 <br /> $ 54,607.50 <br />